My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2017 06 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2017 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2017 06 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:11 AM
Creation date
7/20/2017 1:33:38 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2017 06 08
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SINKCOMBSDETHLEFS <br />ARCHITECTURE DESIGN <br />Exterior Building Design <br />The building's exterior design and materials complement other municipal facilities. Durable and <br />quality materials such as masonry veneer, rainscreen systems, and glazed curtainwall are the <br />primary facade elements. <br />The west facade's ground level pedestrian way incorporates masonry wall sections with <br />architectural details, along with glazed openings. There are also vertical wood sunshades at <br />the ground level which provide further articulation and dimensional character. Interior space <br />program elements along the west facade include Child Watch, Preschool Classrooms, <br />Natatorium, and Fitness Areas. The Fitness Area facade is primarily electrochromatic glazing, <br />which is tinted and actively changes the amount of tint based on the sun exposure at different <br />times of the day. Positioning these functions on the west side of the building will enhance view <br />corridors to open space and mountain vistas. <br />The south facade comprises the two-level Natatorium and Turf Gymnasium spaces. Positioning <br />the Natatorium on the south side of the building will enhance view corridors to open space <br />vistas. The Natatorium facade is primarily glazed curtainwall and masonry veneer, with wood <br />columns supporting a large roof overhang. There is also a freestanding masonry screen wall in <br />front of a portion of the Natatorium's exterior wall. The ground level curtainwall mullion <br />spacing is pedestrian -scale, while the upper glazed sections are more monumental. There are <br />also large glazed openings to the exterior to provide an indoor/outdoor experience. The <br />substantial roof overhang and masonry screen wall will provide shade on the interior and <br />exterior of the building. Likewise, this large overhang and additional lower canopy elements <br />will provide shade and shelter to those occupying the outdoor patio space. The Turf <br />Gymnasium is primarily masonry veneer with high clerestory sections of windows. Like the <br />west facade, the masonry walls of the south facade will include architectural detailing to <br />provide a pedestrian -oriented design. <br />The east facade contains the existing Gymnasium and new Turf Gymnasium. Both will be a <br />masonry veneer system with architectural detailing. The existing Gymnasium will be reskinned <br />with a masonry veneer system to align the new addition's materials. <br />The north facade contains the existing Gymnasium and Senior Center, and the new building <br />expansion. The existing Gymnasium will be reskinned with a masonry veneer system to align <br />the new addition's materials. <br />At the Senior Center's north, east and west facades, the existing exterior walls will be reskinned <br />with both masonry veneer and a rainscreen system. The existing blue metal panel mansard <br />roof sections will be demolished and replaced with a parapet wall system incorporating new <br />facade materials. Additionally, new wood trellis elements will frame the existing entryway. <br />Site and building signage design is underway and will be included in a subsequent submittal. <br />5H <br />
The URL can be used to link to this page
Your browser does not support the video tag.