My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2017 06 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2017 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2017 06 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:11 AM
Creation date
7/20/2017 1:33:38 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2017 06 08
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SINKCOMBSDETHLEFS <br />ARCHITECTURE DESIGN <br />Memory Square Improvements <br />In addition to the Planned Unit Development (PUD) submittal, a Special Review Use (SRU) <br />submittal is also required because the building is a municipal facility. Likewise, an Alteration <br />Certificate Submittal is required since the building is located on a Historic Landmark location - <br />the Memory Square Site and adjacent Center for the Arts building. <br />Project Description <br />The project includes demolition of the existing 3,000 SF Memory Square Poolhouse, that is <br />currently connected to the existing Arts Center building. A new 2,800 SF Poolhouse (2,250 SF <br />enclosed area/600 SF open lounge area), will be constructed and will not be connected to the <br />Arts Building. Rehabilitation and remediation will occur on the north exterior facade of the Arts <br />Center building to restore elements that were affected by the connection of the old Poolhouse. <br />No interior restoration is included. <br />The existing non-compliant ADA ramp to the Poolhouse will be replaced with a compliant <br />design. Also, this ramp will connect to the Arts Center entryway sidewalk so it will also have an <br />ADA -compliant means of access. Additionally, associated site improvements include a deck <br />expansion with outdoor cabana and storage structures, and a splash pad aquatic amenity. The <br />site is part of the Memory Square Park and located at 801 Grant Avenue in old town Louisville, <br />Colorado. <br />The Poolhouse includes: <br />• Locker Rooms <br />• Check -In Area <br />• Lifeguards Office <br />• Lounge Area <br />• Pool Mechanical <br />• Pool Storage <br />Operational/Programming Information <br />Outdoor Gathering Spaces <br />Operating hours for public swim at Memory Square are currently 10am-7pm Monday -Sunday. <br />Private swim teams rent the facility beginning as early at 5am Monday -Saturday. In addition, a <br />private swim team would utilize the outdoor gathering spaces for swim meets up to 6 times a <br />season. Normal season dates for public use are Memorial Day -Labor Day. Rental of the facility <br />could span the months of April -October. This space could also be rented to the public for <br />parties or for special events programmed by the City of Louisville. Amplified sound would be <br />limited to normal operating hours and would be limited to 9 days per year, not including swim <br />meets that will use a sound system to announce at swim meets. <br />61F j <br />
The URL can be used to link to this page
Your browser does not support the video tag.