Laserfiche WebLink
Historic Preservation Commission <br />Meeting Minutes <br />May 30, 2017 <br />Page 2of8 <br />o A location near Steinbaugh Pavilion, and if so, what is the Commission's preferred <br />location? <br />o Another City -owned property within the funding area? <br />* Should the Cabins be relocated together or could they be split between sites? <br />iners Cabins - Descri lion of Costs <br />ite Pre •arationinesi in <br />tilit Coordination <br />$ <br />5,000 <br />..ite Pre to Remove Cabins <br />$ <br />7,500 <br />teel cradle <br />$ <br />3,500 <br />rucking <br />$ <br />2,500 <br />'e•air and Rehabilitation of Cabins <br />$ <br />7,000 <br />emoval of Bracing, Rigging <br />$ <br />3,000 <br />e air of Cabins due to rnove <br />$ <br />5,000 <br />rchitecture and Engineering for <br />ubtotal Re air and Rehab <br />$ <br />98 000 <br />OTAL <br />$ <br />232 870 <br />iners Cabins - Descri lion of Costs <br />ovin <br />tilit Coordination <br />$ <br />5,000 <br />..ite Pre to Remove Cabins <br />$ <br />7,500 <br />teel cradle <br />$ <br />3,500 <br />rucking <br />$ <br />2,500 <br />ovin of Cabins <br />$ <br />7,000 <br />