12/4/84 Page -18- <br />Attorney Rautenstraus stated that we have <br />started doing this. This contract was <br />entered into last spring and he didn't know <br />much, about it. This evening was the first <br />time. that it was brought to his attention. <br />He did think that we did have to make some <br />changes in the original contract document <br />and that never puts the party that is requesrinc_ <br />the changes in a very good position, and that <br />is one of the circumstances that has occurred <br />here. <br />Mr. Cellars stated that the contractor has <br />been very good in giving them a letter that <br />he will maintain this road and will be re- <br />sponsible for the repair of it. He has g<.:_ <br />beyond what the normal expection is in day. <br />that. <br />Councilwoman Morris Inquired of Mr. Cellars when he knew that <br />delineators would be needed for the differer.:~~ <br />of the grade-in-the-road, why he did not in- <br />form us sooner. <br />His reply was that they were not consulted when <br />the change was made and how it was being made <br />until after they had a call from staff and <br />said that it was made and to proceed accordingly <br />He did not feel that it would be a cruical <br />item. It is not going to be any delay in <br />one more week in the closure of those west <br />bound lanes. <br />Dave Blanchard, Acting Mr. Blanchard stated that he had asked <br />City Engineer Centenni-ai-Engin~errng-to-grsgare a plan to <br />carry us through the winter. The contractor`s <br />agreement now with the City - the roadway <br />was split and the 1985 construction, by <br />contract is scheduled for April 1. The problem <br />was that the contractor has temporary con- <br />struction barricades out there. What we are <br />talking about will be a semi-permanent sort <br />of thing, i.e. painting and striping. Be- <br />cause of the number of vehicles per day and <br />because of the number of months involved, <br />it was necessary to do it. He also wanted <br />Council to be aware that that will not be <br />the only change order that will come through <br />due to splitting the contract between 1984- <br />1985. If Council wishes us to proceed with <br />the change order at the staff level, this <br />can be done as soon as we have reviewed and <br />approved the plans. If Council wishes to <br />