My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 1984 08 07
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
1970-1999 City Council Minutes
>
1984 City Council Minutes
>
City Council Minutes 1984 08 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:31:23 PM
Creation date
10/16/2008 4:00:39 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
8/7/1984
Original Hardcopy Storage
2E2
Supplemental fields
Test
CCMIN 1984 08 07
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
8/7/84 Page -6- <br />Director Hioco advised that they try to <br />have 2 people here at all times; but there <br />are times when this is not possible; there- <br />fore this was the reason for this request. <br />APPROVAL Councilman Cussen moved, Councilman Leary <br />seconded when the Cable TV operator is re- <br />quired to work along that he be paid $50.00 <br />per council session. All in favor. Motion <br />carried unanimously.. <br />DOWNTOWN DEVELOPMENT PROJECT Councilmembers had a copy of a memo from <br />DESIGNATING CONSULTANTS Planner, Cathy Kasza on the recommendations <br />of the Steering Committee who would like to <br />requE~st the designation of the following <br />firms as professional consultants for the <br />Downtown Development Projects: <br />1) Financial Advisor - Kirchner Moore & CO. <br />2) Engineering - The Civil Design Group <br />3) Public Signage/Graphic Design <br />- Ampersand Studies, Inc. <br />Cathy Kasza, Planner Ms. Kasza stated that the methology used in <br />this process was a request was sent out for <br />qualifications and then interviewing the <br />consultants that responded. They were look- <br />ing for consultants that could work together <br />effectively as a team; and who had previous <br />experience in a project of this nature. <br />Councilman Fauson Asked if the financing does not come about, <br />i.e. the special taxing district, and sa:i:es <br />tax, how will the consultants be paid? How <br />far will they go with their planning? <br />Ms. Kasza replied as it was laid out at the <br />last time they came before council and re- <br />ques~ted budget allocations from the conti- <br />gency fund, the intention was that they be <br />able to carry the project through design <br />development and then construction designs <br />for the public works portion of the project <br />and the street improvements portion of the <br />project. Then the project will be sitting <br />there ready for financing of options when they <br />become available. They realized that this <br />was somewhat of a gamble but they wished to <br />keep the momentum going and the Steering <br />Committee felt that there was that support <br />in the business community to take that step <br />now. <br />
The URL can be used to link to this page
Your browser does not support the video tag.