My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2017 11 16
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2017 City Council Agendas and Packets
>
City Council Agenda and Packet 2017 11 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:27 PM
Creation date
11/17/2017 8:49:38 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7B5
Supplemental fields
Test
CCAGPKT 2017 11 16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Saunders Estimating System (Project Estimate) <br />Copyright © 1998-2010, Saunders Construction, Inc. <br />User Defined Report <br />CSI <br />Description <br />Section <br />Unit <br />Unit Cost <br />Comments <br />Bid Pac 2 <br />Quantity <br />Bid Pac 2 102,539 <br />1 <br />Amount <br />CSI Sec. Total <br />Cost/SF <br />Telephone (Contractor / Subcontractors) <br />w/ GC's <br />- <br />I <br />Storm Sewer <br />Not Req'd <br />- <br />- <br />Sanitary Sewer <br />Not Req'd <br />- <br />- <br />General Building Heat and Ventilation <br />Not Req'd <br />- <br />- <br />Light and Power <br />w/ 26 00 00 <br />- <br />- <br />Temporary Staging Area <br />Amendment 01 <br />- <br />- <br />Rodent and Pest Control <br />Excluded <br />- <br />- <br />Prairie Dog Removal / Relocation <br />Excluded <br />- <br />- <br />01 50 30 Weather Protection and Conditions <br />- <br />- <br />- <br />- <br />Weather Protection and Conditions <br />Future Amend <br />74,630.00 <br />- <br />Allowance <br />Amendment #1 Weather Protection <br />Amendment 01 <br />25,000.00 <br />- <br />Allowance <br />Turf Gym Weather Protection Allowance <br />Future Amend <br />2.00 <br />- <br />Allowance <br />Snow Removal <br />w/ Allowance <br />- <br />- <br />Thaw Frozen Subgrade <br />w/ Allowance <br />- <br />- <br />Mud Mitigation / Removal <br />w/ Allowance <br />- <br />- <br />Foundation Pump & Bail <br />w/ Allowance <br />- <br />- <br />Temporary Building Enclosures <br />w/ Allowance <br />- <br />- <br />Fabricate Enclosures <br />w/ Allowance <br />- <br />- <br />Install Panels <br />w/ Allowance <br />- <br />- <br />Temporary Doors <br />w/ Allowance <br />- <br />- <br />Weather Coverings <br />w/ Allowance <br />- <br />- <br />Heating for Individual Tasks <br />w/ Allowance <br />- <br />- <br />General Building Heat <br />w/ Allowance <br />- <br />- <br />Weather Protection and Conditions Labor <br />w/ Allowance <br />- <br />- <br />01 60 00 Mock -Ups (Physical & Digital) <br />- <br />- <br />10,000 <br />0.10 <br />Physical Mockups <br />1.0 <br />Allowance <br />10,000.00 <br />10,000 <br />Digital Mockup Modeling <br />- <br />- <br />Architectural / Structural Model Creation <br />w/ Designers <br />- <br />- <br />Architectural / Structural Model Management <br />Amendment 01 <br />100.74 <br />- <br />MEP Model Management <br />Amendment 01 <br />5.95 <br />- <br />As -Built Model <br />Excluded <br />- <br />- <br />01 74 00 Cleaning <br />- <br />- <br />- <br />- <br />Final Cleaning <br />w/ GC's <br />- <br />- <br />Dumpsters <br />w/ GC's <br />- <br />- <br />02 10 00 Hazardous Material Removal <br />- <br />- <br />- <br />- <br />Hazardous Material Removal <br />- <br />- <br />Test and Identify Hazardous Materials <br />Excluded <br />- <br />- <br />Remove Hazardous Material <br />Excluded <br />- <br />- <br />Remove Contaminated Soil <br />Excluded <br />- <br />Asbestos Abatement <br />Excluded <br />- <br />- <br />Air Monitoring <br />Excluded <br />- <br />- <br />Proper Disposal Off -Site <br />w/ Above <br />- <br />- <br />02 22 00 Demolition <br />- <br />- <br />70,000 <br />0.68 <br />Site Demolition <br />w/ 31 30 00 <br />- <br />- <br />Memory Square Demolition <br />1.0 <br />Subquote <br />69,000.00 <br />69,000 <br />Sawcutting <br />1.0 <br />LSum <br />1,000.00 <br />1,000 <br />Building Demolition - Complete Structure/ Foundations, SOG <br />Included <br />- <br />- <br />Dumpsters for Building Demo <br />Included <br />- <br />- <br />Recreation Center Demolition <br />Amendment 01 <br />99,965.00 <br />- <br />03 07 00 Drilled Piers (Caissons) <br />- <br />- <br />- <br />- <br />BP1 Caissons - Subquote <br />Amendment 01 <br />643,518.00 <br />- <br />Drilling <br />Included <br />- <br />- <br />Concrete Placement <br />Included <br />- <br />- <br />Concrete Material <br />Included <br />- <br />- <br />Pool Caisson Allowance <br />Amendment 01 <br />170,000.00 <br />- <br />Allowance <br />Reconcile Allowance to Pool Caisson Design in BP3 <br />Future Amend <br />197,660.00 <br />- <br />BP2 Caissons <br />Future Amend <br />- <br />- <br />Slide Caissons <br />Future Amend <br />27,706.00 <br />- <br />No Design <br />I:\PCS\PCS Estimates\1701025 Louisville Recreation Center\03 Estimates\05 GMP\02 Bid Pac 2\Louisville Rec Center BP2_Final.xlsm <br />Estimate, Page 2 of 13 <br />11/10/2017, 2:49 PM <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.