Laserfiche WebLink
Saunders Estimating System (Project Estimate) <br />Copyright © 1998-2010, Saunders Construction, Inc. <br />User Defined Report <br />CSI <br />Description <br />Section <br />r <br />Unit <br />Unit Cost <br />Comments <br />Bid Pac 2 <br />Quantity <br />Bid Pac 2 102,539 <br />Amount <br />CSI Sec. Total <br />Cost/SF <br />03 07 50 Micropiles <br />Amendment 01 <br />- <br />03 20 00 Concrete Reinforcing Steel <br />- <br />- <br />24,081 <br />0.23 <br />BP1 Rebar <br />Amendment 01 <br />- <br />- <br />BP2 Rebar - Memory Square <br />- <br />Rebar Materials <br />1.0 <br />Subquote <br />15,144.00 <br />15,144 <br />Rebar Install <br />1.0 <br />Subquote <br />8,346.00 <br />8,346 <br />Reinforcing Steel Material <br />- <br />- <br />Caissons Reinforcing Steel Material <br />w/ Bid Pac 1 <br />- <br />- <br />CMU Reinforcing Steel Material <br />w/ 04 20 00 <br />- <br />- <br />Cast in Place Concrete Reinforcing Steel Material <br />- <br />- <br />Footings <br />w/ Bid Pac 1 & 2 <br />- <br />- <br />Pier Caps <br />w/ Bid Pac 1 <br />- <br />- <br />Tie Beams <br />w/ Bid Pac 1 <br />- <br />- <br />Grade Beams <br />w/ Bid Pac 1 <br />- <br />- <br />Walls <br />w/ Bid Pac 1 & 2 <br />- <br />- <br />Surge Tank <br />w/ Bid Pac 1 <br />- <br />- <br />Slabs on Void <br />w/ Bid Pac 1 <br />- <br />- <br />Slabs on Deck <br />w/ Bid Pac 1 <br />- <br />- <br />Slabs on Grade <br />w/ Bid Pac 1 & 2 <br />- <br />- <br />WWF Mesh Material <br />- <br />- <br />Cast in Place Concrete WWF Material <br />w/ Bid Pac 1 <br />- <br />- <br />Reinforcing Steel Labor <br />- <br />- <br />Caissons Reinforcing Steel Labor <br />w/ Bid Pac 1 <br />- <br />- <br />CMU Reinforcing Steel Labor <br />w/ 04 20 00 <br />- <br />- <br />Cast in Place Concrete Reinforcing Steel Labor <br />w/ Bid Pac 1 & 2 <br />- <br />- <br />Miscellaneous Rebar Labor <br />1.0 <br />LSum <br />591.00 <br />591 <br />WWF Mesh Labor <br />- <br />- <br />Cast in Place Concrete WWF Labor <br />w/ Bid Pac 1 <br />- <br />- <br />Reinforcing Steel Accessories <br />w/ Bid Pac 1 & 2 <br />- <br />- <br />Slab Bolsters <br />w/ Bid Pac 1 <br />- <br />- <br />03 30 00 Cast -In -Place Concrete- <br />- <br />179,230 <br />1.75 <br />Concrete Materials <br />Included <br />- <br />- <br />Concrete Pump <br />Included <br />- <br />- <br />Structural Concrete <br />- <br />- <br />Caissons <br />w/ 03 07 00 <br />- <br />- <br />MemorySquareConcrete <br />1.0 <br />Subquote <br />88,854.00 <br />88,854 <br />Pad Footing <br />Included <br />- <br />- <br />Strip Footing <br />Included <br />- <br />- <br />Memory Square <br />- <br />- <br />Stem Wall <br />Included <br />- <br />- <br />Stem Wall w 4" Brickledge <br />Included <br />- <br />- <br />Stem Wall Over Pad Footings <br />Included <br />- <br />- <br />Recreation Center <br />- <br />- <br />Surge Tank Vaults / Splash Pad Pit <br />1.0 <br />Subquote <br />90,376.00 <br />90,376 <br />Interior Concrete Flatwork <br />- <br />- <br />Slab -on -Grade MS <br />Included <br />- <br />- <br />6" SOG MS <br />Included <br />- <br />- <br />Vapor Barrier MS <br />Included <br />- <br />- <br />Weather Conditions <br />w/ 01 50 30 <br />- <br />- <br />03 35 00 Concrete Finishes <br />Future Amend <br />- <br />- <br />- <br />- <br />03 60 00 Grout- <br />- <br />2,828 <br />0.03 <br />Grout at Steel Member Bearing Conditions <br />48.0 <br />Each <br />58.92 <br />2,828 <br />04 20 00 Masonry- <br />- <br />841,113 <br />8.20 <br />Masonry Subquote <br />1.0 <br />Subquote <br />792,028.00 <br />792,028 <br />CMU <br />- <br />- <br />Repairs <br />- <br />- <br />Repair Cuts in existing building <br />1.0 <br />LSum <br />10,000.00 <br />10,000 <br />Patch wall in Locker Room at fixture removal <br />1.0 <br />LSum <br />750.00 <br />750 <br />Brick Infill to Match Existing <br />143.0 <br />SqFt <br />40.00 <br />5,720 <br />8" CMU - Window/Door Infill <br />345.0 <br />SqFt <br />40.00 <br />13,800 <br />I:\PCS\PCS Estimates\1701025 Louisville Recreation Center\03 Estimates\05 GMP\02 Bid Pac 2\Louisville Rec Center BP2_Final.xlsm <br />Estimate, Page 3 of 13 <br />11/10/2017, 2:49 PM <br />13 <br />