Laserfiche WebLink
Saunders Estimating System (Project Estimate) <br />Copyright © 1998-2010, Saunders Construction, Inc. <br />User Defined Report <br />CSI <br />Description <br />Section <br />Unit <br />Unit Cost <br />Comments <br />Bid Pac 2 <br />Quantity <br />Bid Pac 2 102,539 <br />1 <br />Amount <br />CSI Sec. Total <br />Cost/SF <br />07 13 00 Waterproofing <br />- <br />I - <br />14,300 <br />0.14 <br />Elastomeric Waterproofing <br />None <br />- <br />Waterproofing at Surge Tank & Pump Pit <br />1.0 <br />Subquote <br />14,300.00 <br />14,300 <br />Membrane Waterproofing <br />- <br />Vertical <br />None <br />- <br />- <br />Horizontal <br />None <br />- <br />- <br />Water Repellant Coating <br />w/ 09 90 00 <br />- <br />- <br />07 21 00 Building Insulation / Air & Moisture Barriers <br />- <br />- <br />- <br />- <br />Foundation Insulation - 2" XPS rigid <br />w/ 07 11 00 <br />- <br />- <br />Air / Moisture Barrier, Spray -On Insulation, Rigid Insulation <br />Future Amend <br />- <br />- <br />Batt or Blanket Insulation <br />w/ 09 25 00 <br />- <br />- <br />Senior Wing - rigid insulation under mansard <br />Future Amend <br />2.50 <br />- <br />07 24 00 Stucco <br />Future Amend <br />- <br />- <br />- <br />- <br />07 41 00 Metal Wall/Soffit Panels <br />Future Amend <br />- <br />- <br />- <br />- <br />07 46 46 Fiber Cement Siding <br />Future Amend <br />- <br />- <br />- <br />- <br />07 50 00 Membrane Roofing- <br />- <br />610,080 <br />5.95 <br />Membrane Roofing Subcontract <br />1.0 <br />Subcontract <br />610,080.00 <br />610,080 <br />Roofing at Turf Gym <br />Future Amend <br />159,100.00 <br />- <br />5/8" Dens deck gypsum over steel deck <br />Included <br />- <br />- <br />Manufactures peel and stick vapor barrier <br />Included <br />- <br />- <br />2 layers 2.6" R30 polyisocyanurate <br />Included <br />- <br />- <br />all insulation substrate mechanically attached to steel deck <br />Included <br />- <br />- <br />60mi1 minimum feltback white PVC fully adhered membrame <br />Included <br />- <br />- <br />Manufactures 120 mph, 20 yr warranty <br />Included <br />- <br />- <br />07 60 00 Flashing and Sheetmetal- <br />- <br />- <br />- <br />Flashing & Sheetmetal Subcontract <br />w/ 07 50 00 <br />- <br />- <br />Parapet Cap - Turf Gym <br />Future Amend <br />18.00 <br />- <br />Parapet Counter Flashing <br />Included <br />- <br />- <br />CMU Cap Flashing <br />Included <br />- <br />- <br />Gutters <br />Included <br />- <br />- <br />Downspout <br />Included <br />- <br />- <br />Collector Heads <br />Included <br />- <br />- <br />Bellowed roof top expansion <br />Included <br />- <br />- <br />07 72 00 Roof Accessories- <br />- <br />954 <br />0.01 <br />Roof Access Hatch <br />- <br />- <br />Aluminum <br />1.0 <br />Each <br />953.89 <br />954 <br />Translucent Panel Skylights <br />w/ 08 62 00 <br />- <br />- <br />Prefab curb and equipment support units <br />w/ 23 50 00 <br />- <br />- <br />07 81 00 Spray on Fireproofing <br />- <br />- <br />- <br />- <br />Spray on Fireproof Beams and Columns <br />Not Req'd <br />- <br />- <br />07 81 10 Intumescent Fireproofing <br />Excluded <br />- <br />- <br />- <br />- <br />07 90 00 Joint Sealants <br />- <br />- <br />43,920 <br />0.43 <br />Joint Sealants - Rec Center <br />1.0 <br />Subquote <br />35,000.00 <br />35,000 <br />Joint Sealants -Trusses <br />1.0 <br />Subquote <br />3,000.00 <br />3,000 <br />Joint Sealants - Memory Square <br />1.0 <br />Subquote <br />7,000.00 <br />7,000 <br />Fire Caulking <br />1,200.0 <br />LnFt <br />1.60 <br />1,920 <br />07 95 00 Expansion Control- <br />- <br />27,100 <br />0.26 <br />Additional Scope <br />Expansion Control Subquote <br />1.0 <br />Subquote <br />27,100.00 <br />27,100 <br />Exterior Wall <br />Included <br />- <br />- <br />Interior Floor - Rated <br />Included <br />- <br />- <br />Wall <br />Included <br />- <br />- <br />Ceiling <br />Included <br />- <br />- <br />Roof Joints <br />w/ 07 50 00 <br />- <br />- <br />08 00 00 Doors, Frames & Hardware (FOB)- <br />- <br />- <br />- <br />I:\PCS\PCS Estimates\1701025 Louisville Recreation Center\03 Estimates\05 GMP\02 Bid Pac 2\Louisville Rec Center BP2_Final.xlsm <br />Estimate, Page 6 of 13 <br />11/10/2017, 2:49 PM <br />16 <br />