Laserfiche WebLink
Saunders Estimating System (Project Estimate) <br />Copyright © 1998-2010, Saunders Construction, Inc. <br />User Defined Report <br />CSI <br />Description <br />Section <br />Unit <br />Unit Cost <br />Comments <br />Bid Pac 2 <br />Quantity <br />Bid Pac 2 102,539 <br />1 <br />Amount <br />CSI Sec. Total <br />Cost/SF <br />Miscellaneous Steel Framing and Supports <br />6.0 <br />Tons <br />2.500.00 <br />15,000 <br />Overhead Door Framing <br />Included <br />- <br />- <br />Pan Stairs <br />- <br />- <br />Lounge Stairs <br />Included <br />- <br />- <br />New Open Stair <br />Included <br />- <br />- <br />Open Tread Stairs - East Exterior <br />Included <br />- <br />- <br />Exterior Stairs/ Guardrail - Open Grate - East Elevation <br />Included <br />- <br />- <br />Wall Rail <br />Included <br />- <br />- <br />Prefinished Metal Canopy - 4'-6" x 4'-6" <br />Included <br />- <br />- <br />Metal Fabric <br />Included <br />- <br />- <br />Toilet Partition Overhead Steel Support <br />1.0 <br />LSum <br />2,000.00 <br />2,000 <br />Stair Wall Rails <br />Included <br />- <br />- <br />Stair Guard Rails <br />Included <br />- <br />- <br />Guardrail @ Second Floor Overlook <br />Included <br />- <br />- <br />Interior Ramp (South Corridor) - Wall Rails <br />Included <br />- <br />- <br />Site Stairs & Ramps <br />- <br />- <br />Guardrail - South Patio Ramp <br />Included <br />- <br />- <br />Handrails - South Patio Ramp <br />Included <br />- <br />- <br />Handrails - South Patio Stairs <br />Included <br />- <br />- <br />Guardrail - West Exit Ramp <br />Included <br />- <br />- <br />Handrails - West Exit Ramp <br />Included <br />- <br />- <br />Roof Access Ladder <br />Included <br />- <br />- <br />Curtainwall Support Steel <br />Included <br />- <br />- <br />Counter Top Support Brackets <br />12.0 <br />Each <br />85.00 <br />1,020 <br />Pipe Bollards - Miscellaneous <br />10.0 <br />Each <br />570.64 <br />5,706 <br />06 10 00 Rough Carpentry- <br />- <br />10,419 <br />0.10 <br />Roof Blocking <br />Future Amend <br />5.55 <br />- <br />Temporary Roofing <br />Amendment 01 <br />3,500.00 <br />- <br />Blocking for Temporary Roofing <br />Amendment 01 <br />37.54 <br />- <br />Curb Blocking @ Skylights (15 ea.) <br />Future Amend <br />5.55 <br />- <br />Window Nailers <br />Future Amend <br />5.36 <br />- <br />Blocking at Frameless Windows <br />Future Amend <br />5.36 <br />- <br />Built-up Base at Lockers <br />Future Amend <br />26.38 <br />- <br />Backerboards <br />Future Amend <br />2.50 <br />- <br />2 x 6 Backing <br />Future Amend <br />4.43 <br />Boom Lift <br />Future Amend <br />3,522.73 <br />- <br />Dumpster <br />w/ GC's <br />- <br />- <br />Layout <br />Future Amend <br />1,956.39 <br />- <br />Carpentry Working Foreman <br />Future Amend <br />5,025.58 <br />- <br />Carpentry Safety <br />Future Amend <br />2,815.74 <br />- <br />Field Safety Compliance <br />Future Amend <br />1,467.29 <br />First Aid Supplies <br />w/ GC's <br />- <br />- <br />Personal Protective Equipment <br />w/ GC's <br />- <br />- <br />Temporary Ladders <br />w/ GC's <br />- <br />- <br />Fall Protection Measures <br />w/ GC's <br />- <br />- <br />Carpentry Consumable Supplies <br />LSum <br />1,213.20 <br />- <br />Protect Existing Surfaces at Demo Areas <br />1.0 <br />LSum <br />10,418.66 <br />10,419 <br />Turf Gym <br />- <br />- <br />Plywood at Turf Gym Interior <br />Future Amend <br />50,115.00 <br />- <br />06 20 00 Wood Siding <br />Future Amend <br />- <br />- <br />- <br />- <br />06 40 00 Millwork / Finish Carpentry <br />Future Amend <br />- <br />- <br />- <br />- <br />06 60 00 FRP Panels <br />Future Amend <br />- <br />- <br />- <br />- <br />0711 00 Dampproofing <br />- <br />- <br />17,800 <br />0.17 <br />Dampproofing Subquote - Rec Center <br />1.0 <br />Subquote <br />4,300.00 <br />4,300 <br />Dampproofing Subquote - Memory Square <br />1.0 <br />Subquote <br />13,500.00 <br />13,500 <br />Dampproofing - 4'-6" ht <br />Included <br />- <br />- <br />CMU Wall Bituminous Dampproofing <br />None <br />- <br />- <br />I:\PCS\PCS Estimates\1701025 Louisville Recreation Center\03 Estimates\05 GMP\02 Bid Pac 2\Louisville Rec Center BP2_Final.xlsm <br />Estimate, Page 5 of 13 <br />11/10/2017, 2:49 PM <br />15 <br />