My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2017 11 16
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2017 City Council Agendas and Packets
>
City Council Agenda and Packet 2017 11 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:27 PM
Creation date
11/17/2017 8:49:38 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7B5
Supplemental fields
Test
CCAGPKT 2017 11 16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Louisville Recreation / Senior Center Expansion <br />City of Louisville <br />Amendment <br />cc. MS - Temporary erosion control measure installation and maintenance of these measures <br />for duration of the project. <br />dd. B - Asphalt paving in parking areas including patching as shown <br />ee. RC - Pavement markings <br />ff. RC — Concrete paving, curb and gutter <br />gg. B - Site concrete including sidewalks, plaza paving, pool deck paving, landscaping curbs, curb <br />cuts, curbs, ramps and base pads at playgrounds <br />hh. B - Trash enclosures <br />ii. MS - Cast -in-place site retaining walls and footings including brick facing <br />jj. MS - Installation of all water, sanitary, and storm water utility systems to within 5' of the <br />building footprint. <br />kk. RC - Interior playground equipment — See Allowances <br />II. Adjustments to general conditions are included based on Amendment #02 total costs. <br />mm. Saunders Construction's construction and preconstruction fee based Amendment #02 <br />total costs. <br />Specific Exclusions (to be included in future Amendments) <br />a. RC - Adjustments to pool caisson allowance (included in Amendment #01) based on revised <br />pool structure design <br />b. B - Polished concrete flooring and concrete floor sealer <br />c. B - Rough carpentry, backing and blocking <br />d. RC - Plywood at turf gym perimeter walls <br />e. B - Millwork and casework <br />f. RC - Stucco exterior finish <br />g. RC - Exterior metal wall panels <br />h. B - Fiber Cement siding <br />i. RC - Fluid applied air barrier at exterior walls <br />j. B - Hollow metal, wood, fiberglass doors, hollow metal frames, and door hardware <br />k. B - Exterior storefront, curtainwall, and aluminum and glass doors <br />I. B - Interior glazing, mirrors, sidelites, and aluminum and glass doors <br />m. B - Exterior stud framing and sheathing, building insulation, interior stud framing and <br />gypsum board systems <br />n. B - Ceramic tile <br />o. RC - Acoustical ceilings and linear metal ceilings <br />p. RC - Wood athletic flooring <br />q. RC - Resilient flooring and base <br />r. RC - Athletic rubber flooring <br />s. RC - Carpeting <br />t. RC - Synthetic turf flooring <br />Saunders Construction, inc. <br />Page 3 of 16 <br />26 <br />11/10/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.