Laserfiche WebLink
Louisville Recreation / Senior Center Expansion <br />City of Louisville <br />Amendment <br />c. Geotechnical Evaluation of additional Sub -slab fill section alternates as prepared by Ground <br />Engineering, dated August 16, 2017. <br />CLARIFICATIONS <br />1. This Amendment does not replace any wording or attachments included in Amendment #01 <br />2. This Amendment #02 generally includes all work necessary for the building core and shell. <br />Specific items included with this Amendment #02 area as follows: <br />Specific Inclusions (MS = Memory Square RC = Recreation and Senior Center B = Both Sites) <br />a. MS - Temporary signage, barricades, etc. necessary for building and site demo. <br />b. B - Project mock-ups <br />c. MS - Demolition of concrete sidewalks, pool deck, existing pool, and landscaped areas. <br />d. MS - Demo of existing pool building. <br />e. MS - Removal of pool fencing as shown. <br />f. MS - Concrete foundations including footings, foundation walls, and slab -on -grade. <br />g. RC — Foundation changes shown in Bid Pac 2 drawings including surge tank vaults and splash <br />pad pit. <br />h. B - Interior and exterior masonry including CMU and stone masonry. <br />i. B - Structural and miscellaneous steel materials and erection <br />j. B - Dampproofing and waterproofing <br />k. B - Membrane roofing and sheetmetal flashing <br />I. RC - Roof accessories <br />m. B - Joint sealants <br />n. RC - Wall, floor, ceiling and roof expansion joints <br />o. RC - Overhead coiling doors <br />p. RC— Skylights <br />q. RC—Operable panel partitions <br />r. MS — New kids pool including structure, piping, and equipment. <br />s. RC — Replace filters at existing pools <br />t. RC —Temporary scaffolding platform at Natatorium for ceiling work <br />u. RC - Fire sprinkler system <br />v. B - DDC temperature controls <br />w. B - Plumbing systems complete <br />x. B - Mechanical systems complete <br />y. B - Electrical systems complete <br />z. MS - Surveying and layout for sitework and building foundations <br />aa. MS - Overlot grading, foundation excavation, foundation backfill, final grading, and <br />import/export of fill as required. <br />bb. RC—Additional Rip Rap and Cobble shown in Bid Pac 2 drawings <br />Saunders Construction, inc. <br />Page 2 of 16 <br />25 <br />11/10/2017 <br />