My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2017 11 16
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2017 City Council Agendas and Packets
>
City Council Agenda and Packet 2017 11 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:27 PM
Creation date
11/17/2017 8:49:38 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7B5
Supplemental fields
Test
CCAGPKT 2017 11 16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Louisville Recreation / Senior Center Expansion <br />City of Louisville <br />Amendment 2 <br />10. Saunders Construction agrees to record all as -built information on a set of construction <br />documents at the jobsite. At the completion of the Project, Saunders Construction will turn over, <br />to the Architect, all notes of locations or details which differ from the original Construction <br />Documents or from written modifications. Saunders Construction will not be responsible for <br />transferring to the as -built documents any addenda, clarifications, or changes documented by the <br />consultants. <br />11. Throughout the course of pre -construction and construction, employees and subcontractors of <br />Saunders Construction LLC may provide suggestions and sketches to aid in pricing clarifications. <br />The Contractor may also offer alternative means, methods or products as "Value Engineering" <br />options. If these aids or value engineering options are incorporated by the design team, Saunders <br />Construction Inc. assumes no liability or responsibility for design, engineering, compatibility, or <br />appropriateness of this design. <br />12. Due to the on-going escalation in raw materials and fuel costs currently facing the construction <br />industry, certain subcontractors and suppliers may not be able to honor their original price, since <br />the final price for their materials is not established until the shipment date. In addition, certain <br />materials may not be available at the required time, due to allocations and spot shortages. Every <br />effort has been made to anticipate and mitigate cost and schedule impacts. However, in the event <br />this should occur, Saunders Construction reserves the right to request an increase in the GMP and <br />an extension of the completion date to cover these additional costs and delays. <br />13. This estimate, which upon acceptance shall be converted to the Contract Sum, includes prices <br />complying with all current and known tariffs, trade treaties, and other governmental requirements <br />as of the date of the estimate. However any changes in project cost or schedule due to new <br />tariffs, treaties, impacts from a trade war, or other changes in governmental requirements shall be <br />considered a force majeure event and the Contract Sum and Project Schedule shall be adjusted <br />accordingly based on the effects of said force majeure event. <br />14. Saunders Construction proposes to self -perform under a lump sum basis the following work on <br />the project (including all related materials and equipment): <br />a. Surveying and layout <br />b. Cast -in-place concrete <br />15. Saunders Construction proposes to self -perform under a GMP basis the following work on the <br />project (including all related materials and equipment): <br />a. Building Information Modeling (BIM) <br />b. Traffic control, access control <br />c. Safety provisions such as temporary handrails, temporary stairs, opening covers, fall <br />protection, and similar site protection <br />d. Miscellaneous demolition <br />e. Installation of temporary partitions <br />f. Rough carpentry, backing, and blocking <br />g. Installation of doors, frames, and associated hardware <br />h. Protection of new and existing finishes <br />16. Weather Protection and Weather Conditions Allowance includes: all labor, material, rental, and <br />subcontracts to provide weather related building enclosures, temporary closures at openings, <br />Saunders Construction, inc. <br />Page 7 of 16 <br />30 <br />11/10/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.