My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2017 11 16
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2017 City Council Agendas and Packets
>
City Council Agenda and Packet 2017 11 16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:27 PM
Creation date
11/17/2017 8:49:38 AM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
7B5
Supplemental fields
Test
CCAGPKT 2017 11 16
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Louisville Recreation / Senior Center Expansion <br />City of Louisville <br />Amendment <br />16. Identification, handling, removal and disposal of unsuitable or contaminated soil materials. <br />17. Lime or fly ash stabilization or moisture conditioning of subgrades. <br />18. Site dewatering or wellpoint dewatering system. <br />19. Janitorial services in existing occupied spaces and at newly remodeled spaces that are turned over <br />to the recreation center. <br />20. Weather delays outside contract requirements <br />21. Water repellants or sealing of interior or exterior brick, CMU and/or stone. <br />22. Repair and replacement of existing asphalt except as disturbed or damaged by construction <br />activities. <br />23. AISC certifications on steel fabrication and erection <br />24. Roofing type R-5. None shown <br />25. Specification section 71326 Self Adhering Sheet Waterproofing <br />26. Asphalt materials per section 075419 PVC roofing. Not required based on the PVC system <br />designed. <br />27. Furniture, fixtures, and equipment, except as provided for in the contract documents. Specifically <br />excluded are the following: <br />a. Switches, computers, phones, surge suppression strips at office desks <br />b. Desks, filing cabinets, keyboard trays, etc. <br />c. Exercise equipment including treadmills, steppers, weight machines, loose weights, mats, <br />balls, etc. <br />d. Sports equipment including balls, ball racks, rackets, ropes, etc. <br />e. Vending equipment <br />f. Free standing storage industrial shelving in Turf Storage Room (A5.31) <br />g. Laminate mobile pedestal files w/ shelf at Control desk <br />h. Residential appliances <br />28. Testing or repair of existing equipment, piping, ductwork, controls not impacted by the <br />construction activities. <br />29. Coolers, freezers, and refrigeration equipment and piping. <br />30. Testing, inspections, adjustments to the existing elevator <br />31. Centering of sprinkler heads in ceiling tile. <br />32. Ductwork cleaning <br />33. Fire pump and transfer switch <br />34. Heat tracing of gutters and downspouts <br />35. Sidewalk and/or driveway snow melt system <br />36. Items listed in the estimate detail as "excluded". <br />Saunders Construction, inc. <br />Page 11 of 16 <br />34 <br />11/10/2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.