Init. <br />g. RC - Foundation changes shown in Bid Pac 2 drawings including surge tank vaults and splash pad <br />pit. <br />h. B - Interior and exterior masonry including CMU and stone masonry. <br />i. B - Structural and miscellaneous steel materials and erection <br />j. B - Dampproofing and waterproofing <br />k. B - Membrane roofing and sheetmetal flashing <br />1. RC - Roof accessories <br />m. B - Joint sealants <br />n. RC - Wall, floor, ceiling and roof expansion joints <br />o. RC - Overhead coiling doors <br />p. RC - Skylights <br />q. RC - Operable panel partitions <br />r. MS - New kids pool including structure, piping, and equipment. <br />s. RC - Temporary scaffolding platform at Natatorium for ceiling work <br />t. RC - Fire sprinkler system <br />u. B - DDC temperature controls <br />v. B - Plumbing systems complete <br />w. B - Mechanical systems complete <br />x. B - Electrical systems complete <br />y. MS - Surveying and layout for sitework and building foundations <br />z. MS - Overlot grading, foundation excavation, foundation backfill, final grading, and import/export <br />of fill as required. <br />aa. RC - Additional Rip Rap and Cobble shown in Bid Pac 2 drawings <br />bb. MS - Temporary erosion control measure installation and maintenance of these measures for <br />duration of the project. <br />cc. B - Asphalt paving in parking areas including patching as shown <br />dd. RC - Pavement markings <br />ee. RC - Concrete paving, curb and gutter <br />ff. B - Site concrete including sidewalks, plaza paving, pool deck paving, landscaping curbs, curb <br />cuts, curbs, ramps and base pads at playgrounds <br />gg. B - Trash enclosures <br />hh. MS - Cast -in-place site retaining walls and footings including brick facing <br />ii. MS - Installation of all water, sanitary, and storm water utility systems to within 5' of the building <br />footprint. <br />jj. RC - Interior playground equipment - See Allowances <br />kk. Adjustments to general conditions are included based on Amendment #02 total costs. <br />11. Saunders Construction's construction and preconstruction fee based Amendment #02 total costs. <br />Amendment #02 excludes (this work will be included in future amendments): <br />a. RC - Adjustments to pool caisson allowance (included in Amendment #O1) based on revised pool <br />structure design <br />b. B - Polished concrete flooring and concrete floor sealer <br />c. B - Rough carpentry, backing and blocking <br />d. RC - Plywood at turf gym perimeter walls <br />AIA Document Al 33TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or <br />any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This <br />document was produced by AIA software at 07:55:53 on 11/13/2017 under Order No.9000755938_1 which expires on 01/02/2018, and is not for resale. <br />User Notes: 6 (943812164) <br />