Laserfiche WebLink
Init. <br />e. B - Millwork and casework <br />f. RC - Stucco exterior finish <br />g. RC - Exterior metal wall panels <br />h. B - Fiber Cement siding <br />i. RC - Fluid applied air barrier at exterior walls <br />j. B - Hollow metal, wood, fiberglass doors, hollow metal frames, and door hardware <br />k. B - Exterior storefront, curtainwall, and aluminum and glass doors <br />1. B - Interior glazing, mirrors, sidelites, and aluminum and glass doors <br />m. B - Exterior stud framing and sheathing, building insulation, interior stud framing and gypsum <br />board systems <br />n. B - Ceramic tile <br />o. RC - Acoustical ceilings and linear metal ceilings <br />p. RC - Wood athletic flooring <br />q. RC - Resilient flooring and base <br />r. RC - Athletic rubber flooring <br />s. RC - Carpeting <br />t. RC - Synthetic turf flooring <br />u. RC - Acoustical wall panels <br />v. B - Interior and exterior painting and wall coverings <br />w. RC - Marker boards <br />x. B - Toilet compartments and accessories <br />y. B - Wall and comer guards <br />z. RC - Fireplace <br />aa. B - Interior and exterior signage <br />bb. B - Lockers <br />cc. B - Fire extinguishers and cabinets <br />dd. RC - Food service equipment <br />ee. RC - Athletic equipment <br />ff. RC - Window coverings <br />gg. B - Data cabling and equipment <br />hh. B - Building security systems and card readers <br />ii. RC - Audio visual systems, equipment, wiring, projection screens, and televisions <br />jj. B - Site fencing <br />kk. B - Site furnishings <br />11. RC - Poured playground surfacing <br />mm. B - Landscape irrigation, plantings, and ground cover <br />nn. RC — All work at the Turf Gym (to be included in Amendment #04) including structural and <br />miscellaneous steel, exterior metal wall panels, roofing, interior finishes: gyp board walls, CMU <br />walls, painting, plywood wall finishes, sealed concrete, turf flooring. Building pad prep and <br />concrete foundations and slabs are included in Amendment #O1. <br />B. Amendment #02 is incorporated into the Agreement by reference <br />C. The Agreement stipulates that early construction packages and the associated partial Guaranteed Maximum <br />Prices (GMPs) shall commence upon approval of the partial GMP Amendments. As such, work under this <br />AIA Document Al 33TM — 2009 Exhibit A. Copyright © 1991, 2003 and 2009 by The American Institute of Architects. All rights reserved. WARNING: This <br />AIA® Document is protected by U.S. Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA® Document, or <br />any portion of it, may result in severe civil and criminal penalties, and will be prosecuted to the maximum extent possible under the law. This <br />document was produced by AIA software at 07:55:53 on 11/13/2017 under Order No.9000755938_1 which expires on 01/02/2018, and is not for resale. <br />User Notes: 7 (943812164) <br />