My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Sustainability Advisory Board Agenda and Packet 2018 01 17
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
SUSTAINABILITY ADVISORY BOARD
>
2010-2019 Sustainability Advisory Board Agendas and Packets
>
2018 Sustainability Advisory Board Agendas and Packets
>
Sustainability Advisory Board Agenda and Packet 2018 01 17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 10:43:27 AM
Creation date
1/30/2018 9:30:45 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
SUSABPKT 2018 01 17
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Electric Vehicle (EV): the incremental cost differential between an EV and <br />the comparable gasoline vehicle up to $8,260 <br />• Level 2, Single Port Station: $3,260 <br />• Level 2, Dual Port Station: $6,260 <br />• Level 3, Single Connection Standard Station: $13,000 <br />• Level 3, Multiple Connection Standard Station: $16,000 <br />Most likely immediate replacement vehicle request: The Police Department has <br />identified one vehicle (non -patrol) that will be up for replacement in 2018 and <br />would like to look into the possibility of purchasing an electric vehicle, as well <br />as a potential EV station for the department. In addition, vehicles are in design <br />stage which potentially could be appropriate for patrol fleet, and in which the <br />department chief has expressed interest (e.g. 2019 Ford Police Responder <br />Hybrid Sedan). A replacement such as this would need to be evaluated at a <br />later date, once data is available. Based on current offerings through RAQC, as <br />well as on stated pledges of support at a state level, it is expected that there <br />will be an appropriate grant to provide partial funding at the appropriate time. <br />In addition, the Facilities Manager has suggested that the City could greatly <br />improve emission output by exploring electric lawn mowing equipment. <br />According to the Parks and Recreation Department, this option has been <br />explored and has been determined to not currently meet performance <br />requirements. The Parks and Recreation Department will continue to monitor <br />this going forward. The RAQC grant applies to mowing equipment and pays for <br />80% of the cost difference between an electric vehicle and a gas vehicle. <br />Benefits to an electric mower would a significant reduction in GHG emissions, <br />as well as noise pollution. <br />In order to support a conversion to electric vehicles, the City will need to adapt <br />infrastructure to meet charging needs. <br />The City Manager's Office is planning to apply for a grant to install an electric <br />vehicle charging station (EVSE) at the Recreation Center in 2018. A plan is <br />being discussed to explore future charging stations at City facilities. <br />The City has also done extensive work to evaluate a compressed natural gas <br />(CNG) station for CNG vehicles. <br />
The URL can be used to link to this page
Your browser does not support the video tag.