My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parks and Public Landscaping Advisory Board Agenda and Packet 2018 03 01
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PARKS AND PUBLIC LANDSCAPING ADVISORY BOARD (fka HORTICULTURE FORESTRY ADVISORY BOARD)
>
2000-2019 Horticulture and Forestry Advisory Board Agendas and Packets
>
2018 Parks and Public Landscaping Advisory Board Agendas and Packets
>
Parks and Public Landscaping Advisory Board Agenda and Packet 2018 03 01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:40:37 AM
Creation date
3/12/2018 11:06:02 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PPLABPKT 2018 03 01
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1IZ <br />feel <br />PRELIMINARY PLANNED UNIT DEVELOPMENT <br />96th AND DILLON <br />A COMMERCIAL SUBDIVISION OF LAND <br />ST. LOUIS PARISH AND COMMERCIAL PARK <br />LOCATED INTIE wT <br />can1/E w Wm E RANGE 69 WEST <br />FEBRUARY 5,2018 <br />SITE PHASING <br />CITY OF <br />LOT1 <br />NORTH ACCESS <br />LOUISVILLE <br />L0T3 <br />Lor 2 <br />MAIN ACCESS <br />SOUTH ACCESS <br />.S. 96Th STREET <br />OPEN SPACE <br />PHASE A SITE ACCESS MAIN CENTER ROAD <br />DEVELOPMENT PLAN NOTES: <br />s. <br />-10 SUPPORT THE LAND DEVELOPMEN, SUCH AS PRELIMINARY 0R <br />Fwu Pa DA71ENL,OrM,EuNDT OF <br />THE CHURCH ON TRACT 1 WILL REQUIRE THE PROCESSING or <br />PHASING NOTES: <br />OPEN SPACE <br />1 PHASE A IS EMPEC-ILD -10 SlAPT THE PROJECT ANY OF THE OTHER PHASES COULD BE <br />CONCURRENT WI, PHASE A. OR EACH OTHER. PENDING FINAL RENEW 4rIH THE CITY <br />DEGRADES THE LEVEL OF SERNCE <br />J EACH PARCEL OF LAND REMAINING AFTER THE INITIAL FINAL PLAl WOULD HAVE A VARIABLE <br />LF.EAVREELO,F IMPROVEMEN, -10 COMPLETE THE FINAL ND'S AND PLA, FOR THOSE PARTICULAR <br />,s,LA;t:.,2171ATRELDA1.-1To'N=7,HIH'ERR'ALnPaTI=L 'A-rT'A,TEPE THERE WILL <br />NIL-laNEGrriASSOCIATED 141, 1HE CHURCH SITE THAT IS INDEPENDENT OF THE OVERALL <br />5 ri- S <br />AND FINDINGS lHIS INCLUDES THE POTENTIAL CONNEClION 0F THE SEWER FROM GAMES <br />PARCEL IN -10 ,E OVERALL SYSTEM FOR lHE PROJECl AND THE POTENTIAL -10 UTILIZE AN <br />6 REFER -10 lHE MAS,R UlILIre PLAN FOR SPECIFIC INFORMATION REGARDING PHASING <br />PHASING NOTES <br />PHASE A <br />PHASE B <br />PHASE C <br />PHASE D <br />PHASE A INCLUDES THE DEVELOPMENT OF LOT 1 AND SUPPORTING INFRASTRUCTURE. PHASE A IS THE <br />ASCENT CHURCH WITH PARKING LOTS, PLAYGROUNDS, AND ASSOCIATED SITE FEATURES', PUBLIC ROAD <br />C; INTERIM ACCESS ROAD ON THE SOUTH SIDE OF LOIS 1 AND 2; THE CONNECTING PRIVATE ROAD <br />FROM THE INTERIM ACCESS TO ROAD C, WIDENING OF S 96TH STREET; INTERIM DETENTION POND AND <br />OUTFALL; SEWER OUTFALL FROM THE CTC TO PUBLIC ROAD B AND WEST TO LOT 2; POTABLE WATER <br />EXTENSION FROM DILLON/S 96TH INTERSECTION TO NE CORNER OF SITE AND CONNECTION TO EXISTING <br />TRANSMISSION MAIN ON THE EAST SIDE OF THE SITE; STORM DRAIN CHANNEL CH -4; LANDSCAPING; <br />LIGHTING, RELATED DRY UTILITIES FOR GAS, ELECTRIC. CABLE TV, INTERNET, AND OTHER ANCILLARY <br />ITEMS. <br />MAY BE COMPLETION OF THE SIGNAL AT ROAD B ANDS 96TH STREET_ <br />MAY BE THE IMPLEMENTATION OF THE REGIONAL POND AND OUTFALL; IMPLEMENTATION OF THE <br />INFLUENT PIPE AND CH -2; COMPLETION OF ROAD B IN ITS FINAL CONFIGURATION; COMPLETION OF <br />ROAD q COMPLETION OF RELATED DRY UTILITY CONNECTIONS FOR GAS ELECTRIC PHONE, CABLE TV. <br />FIBER, COMPLETION OF THE TRAIL ALONG THE EAST AND SOUTH SIDE OF THE SITE', AND OTHERS. <br />MAY BE DEVELOPMENT OF INDIVIDUAL SITES WITHIN THE OVERALL PROPERTY INCLUDING PARCELS 1 TO 5 <br />AND LOTS 2 TO 4 WITH ASSOCIATED SITE PLANS, LANDSCAPE. LIGHTING. AND APPURTENANT ITEMS. <br />DATE <br />BY <br />REVISION/ISSUE APPY <br />DATE <br />CLQ <br />CiviIEngineers <br />F. 30.041874 <br />SITE PHASING <br />PH <br />SHEET 5 OF 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.