My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2018 07 12
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2018 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2018 07 12
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:11 AM
Creation date
7/20/2018 10:03:46 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2018 07 12
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Aril' o =Ai 1.a.1411.= <br />ATM MI <br />a1.rllr*r7Yl <br />roan' <br />5 <br />gro <br />i-1Rdl' <br />4. oF4rp <br />Fi• <br />air <br />t o wva <br />O /w• }12 <br />I• <br />Y• <br />nW_S Zi�tL t urL cur x J <br />44. <br />wx <br />J <br />*� <br />1116E f�+' .01 5 4r HrA'JGR <br />iL! <br />r ww� <br />.er 1 <br />-- <br />Easement Vacation <br />. Ar= <br />r <br />1 i <br />I { <br />I , <br />ems mew ua <br />rraw j.111Pipha daV 4+1L ♦L I <br />Im I• <br />r. 1.1.11.1.- <br />r <br />Planned Unit Development Amendment <br />The applicant requests a PUD Amendment to make minor changes to the site design, <br />parking and architecture. The site is generally configured in the same manner as the <br />existing PUD, with a building on each lot, associated site landscaping, parking, drainage <br />and utilities. The PUD will allow construction of two buildings, one on each lot. The <br />previous PUD did not review the site coverage requirements by lot, rather as a whole. <br />This PUD Amendment breaks out the coverages by lot, and if viewed separately, the <br />application would not meet some standards in the IDDSG, specifically parking and <br />landscape coverage requirements. More detail and staff's analysis of the waiver <br />requests is provided in the analysis section below. The table below compares the <br />previous PUD with the PUD under consideration: <br />Site Details <br />Previous PUD <br />Proposed PUD <br />Allen Company <br />Pc -July 12, 2018 <br />Page 3 of 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.