Laserfiche WebLink
50 . Section 916. 1 is amended by the deletion of <br /> Table 916 l and the insertion of Table <br /> 710 . 1 (1) . <br /> 51 Table 916. 1 is deleted in its entirety. <br /> 52 . Section 917 is deleted in its entirety. <br /> 53 Section 918 is deleted in its entirety. <br /> 54 . Table 918.2 is deleted in its entirety <br /> 55 . Section 1003 .2 is amended by addition of a <br /> new final to read as follows : The design <br /> and location of interceptors shall be <br /> approved by the Chief Building Official and <br /> shall have adequate number of manholes with <br /> gastight covers with a minimum opening <br /> dimension of twenty (20) inches . Each <br /> interceptor shall be installed and connected <br /> so that it is at all times easily accessible <br /> for inspection, cleaning, and removal of the <br /> intercepted grease . <br /> 56 Section 1003 . 5 is amended by addition of the <br /> following at the bottom of such section: <br /> The size of grease interceptors shall be <br /> determined by using the following formula . <br /> (Number of meals served per peak hour) x <br /> (Waste flow rate') x (Retention Factor2) x <br /> (Storage Factor3) = Interceptor Size/Liquid <br /> Capacity. <br /> 1 Waste Flow Rate . <br /> a. With dishwashing machine . ... ....... 6 gallon flow <br /> b Without dishwashing machine ........ 5 gallon flow <br /> c. Single service kitchen .. ... ..... 2 gallon flow <br /> d Food waste disposer .... .... .......... 1 gallon flow <br /> 2. Retention Times <br /> a. Commercial kitchen waster / Dishwasher 2 5 hours <br /> b Single service kitchen / Single serving . .. 1 5 hours <br /> 3 Storage Factor <br /> a. Fully equipped commercial kitchen.. 8 hour operation 1 <br /> . ... . .. ....... ........ ........ 16 hour operation• 2 <br /> 24 hour operation 3 <br /> b Single Service Kitchen. ... ...... .. ... . ....... ...... ................ 1 5 <br /> 57 . Section 1201 . 2 is amended to read as <br /> follows : <br /> 1201 . 2 All fuel piping systems shall be <br /> sized, installed, tested and placed in <br /> operation in accordance with the requirements <br /> of the 1997 Uniform Mechanical Code, Chapter <br /> 13 , Fuel-Gas Piping. <br /> 9 <br />