Laserfiche WebLink
FRONT STREET PARTNERS PUD <br />Boulder County, CO 03684903 <br />P:\Projects\2015\15_726 Front Street\17_core_exterior update\01 drawings\05_Revit\18_PUD_726 Front Street.rvt <br />9/28/2018 4:11:33 PM <br />8" CEMENT BOARD PANELS OVER <br />BATTENS AND RAINSCREEN <br />MEMBRANE. CEMENT GRAY FINISH <br />A606 STEEL AWNING <br />0;SUBFLOOR <br />113'-6" <br />T.O. 01 SUBFLOOR <br />100'-0" <br />T.O. 720 SUBFLOun <br />7- 99'-0" <br />M <br />+ T.O. 02 SUBFLOOR <br />113' - 6" <br />• <br />T.0.01 SUBFLOOR <br />100'-0" <br />T.O. 720 SUBFLOOR <br />7' 99' - 0" <br />T.O. 02 SUBFLOOR <br />113' - 6" <br />A FIRST AMENDMENT TO THE JOHNATHAN J. PROUTY COMMERCIAL <br />BUILDING PUD RECORDED JUNE 5, 1990 UNDER RECEPTION No. 1045752 <br />726 FRONT STREET <br />LOUISVILLE, CO 80027 <br />LEGAL DESCRIPTION <br />LOTS 2, 3 AND 4, BLOCK B, CITY OF LOUISVILLE, <br />COUNTY OF BOULDER STATE OF COLORADO <br />ISSUE DATE <br />T.O.01 SUBFLOOR <br />100' - 0" <br />T.0.70"20SUBFLOOR <br />99' - <br />STUCCO FINISH <br />(E) WOOD FRAME WINDOWS <br />/ <br />(E) ANODIZED ALUMINUM <br />STOREFRONT SYSTEM <br />/ (E) STUCCO REVEAL (INSET) <br />/(E) STUCCO CORNICE W/ <br />PAINTED METAL COPING <br />RE: PERMIT COM-0158-2017 FOR <br />REMODEL INFORMATION ON 2 — <br />STORY BUILDING. <br />09/28/2018 <br />RE: PERMIT COM-0158-2017 FOR <br />RE NODEL INFORMATION ON 2 <br />STORY BUILDING. <br />PROPOSED SOUTH ELEVATION <br />SCALE: 1/8" =1'-0" <br />(E) CMU, PAINT TO MATCH <br />APPROVED STUCCO @ 2 <br />STORY BUILDING <br />(E) ANODIZED ALUMINUM <br />STOREFRONT SYSTEM <br />EXISTING EAST ELEVATION. <br />SCALE: 1/8" =1'-0" <br />(E) ELECTRICAL AND GAS <br />EQUIPMENT. PAINT, AS ALLOWED, <br />TO MATCH APPROVED STUCCO @ <br />2 STORY BUILDING <br />(N) DOWNSPOUT, PAINT TO <br />MATCH APPROVED STUCCO @ 2 <br />STORY BUILDING <br />r <br />A606 STEEL AWNING AND WALL <br />PANEL <br />(N) STOREFRONT GLAZING W/ <br />ANODIZED ALUMINUM FRAME <br />(N) SSG STOREFRONT <br />SYSTEM W/ ANODIZED <br />ALUMINUM FRAME <br />PROPOSED WEST ELEVATION <br />SCALE: 1/8" =11-0" <br />T.O. 02 SUBFLOOR <br />113'-6" <br />0 <br />T,O.01 SUBFLOOR <br />100'-0" <br />T.O, 720 SUBFLOOR <br />99'-0" <br />PROPOSED EAST ELEVATION <br />SCALE: 1/8" =1'-0" <br />• <br />(N) PARAPET CAP, FINISH TO <br />CEMENT BOARD <br />8" CEMENT BOARD PANELS <br />OVER BATTENS AND <br />RAINSCREEN MEMBRANE. <br />CEMENT GRAY FINISH <br />• <br />(N) STOREFRONT GLAZING <br />W/ ANODIZED ALUMINUM <br />FRAME <br />A606 STEEL PANELS OVER <br />BATTENS AND <br />RAINSCREEN MEMBRANE <br />RE: PERMIT COM-0158-2017 <br />FOR REMODEL INFORMATION <br />ON 2 STORY BUILDING. <br />(E) CMU, PAINT TO MATCH <br />APPROVED STUCCO @ 2 STORY <br />BUILDING <br />A'ch <br />11 <br />3100 CARBON PL #100 BOULDER, CO 80301 <br />1200 BANNOCK ST DENVER, CO 80204 <br />303.546.6868 archl 1.com <br />FRONT STREET PARTNERS PUD <br />09/28/2018 <br />ISSUE DATE <br />COPYRIGHT 2018 - THESE DRAWINGS AND THE DESIGN <br />THEY REPRESENT REMAIN THE PROPERTY OF ARCH11, <br />INC. AND ARE INTENDED TO BE USED FOR <br />CONSTRUCTION AT THE STATED LOCATION. ANY <br />UNAUTHORIZED REPRODUCTION OR OTHER USE OF <br />THESE DRAWINGS OR DESIGN IS STRICTLY PROHIBITED. <br />EXTERIOR ELEVATIONS <br />A200 <br />