My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2018 12 13
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2018 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2018 12 13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:55:11 AM
Creation date
12/17/2018 4:52:10 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2018 12 13
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
526
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />October 11, 2018 <br />Page 5 of 17 <br />Hoefner asked if the applicant had considered putting the columbarium somewhere else <br />where it would be a use -by -right. <br />Lord responded that a columbarium like the one proposed is meant to be a part of the <br />church. <br />Hsu asked about access to the Columbarium. <br />Lord stated that the sanctuary was contained within the building and the access to the <br />columbarium would be through exterior doors on the east side of the sanctuary space. <br />Doors are open during church and community events. <br />Hsu asked for confirmation that the sanctuary doors led to the rest of the church and not <br />directly to the outside. <br />Lord stated that access to the columbarium would be regulated by the front doors of the <br />church, which were open mostly during church events and sometimes for other <br />community events, such as AA meetings. <br />Howe asked if the applicant had considered a roof over the columbarium. <br />Lehman responded that they had considered a roof but figured that it would bring more <br />attention to the space. <br />Ritchie responded to Commissioner Hoefner's earlier question about the lot coverage of <br />the columbarium. The existing building was roughly 6,300 square feet and the <br />columbarium would be 350 square feet, meaning it would take up less than 5% of the <br />total space of a building that was on a three -and -a -half acre site. <br />Brauneis opened public comment and requested that the emails be entered into the <br />record. Hsu moved and Moline seconded. Voice vote. Motion passed unanimously. <br />Lu Yu, 720 Pine Needle Lane, stated that the proposed columbarium would be contrary <br />to neighborhood welfare. No neighbors on his street thought it was a good idea. A <br />cemetery classification was not compatible with the character of the surrounding <br />neighborhood, even though it might be compatible with the church architecture. <br />Louisville has a public cemetery within minutes of the church. He asked the City to <br />reject the application. <br />Jane Massie, 178 South Buchanan Avenue, stated that she had not received notice of <br />the proposal even though she lived three blocks from the church. She thought that it <br />would set a precedent and therefore all city residents deserved notice. She stated that <br />the columbarium was a new phenomenon that was not in the Lutheran church that she <br />grew up in. She asked the Commission to consider people's feelings and not just if the <br />proposal met the criteria. She added that the vacation bible school would use the door <br />to access the yard and that the door would be an emergency door. She stated that <br />Christ the Servant would continue to serve the community and the Church was more <br />about faith than having the dead around. <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.