My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 2019-02
PORTAL
>
CITY COUNCIL RECORDS
>
RESOLUTIONS (45.160)
>
2010-2019 Resolutions
>
2019 Resolutions
>
Resolution 2019-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2024 3:11:33 PM
Creation date
1/9/2019 9:34:26 AM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
Quiet Zones Project Concrete Construction Services Agreement __NORAA Concrete Construction Corp
Doc Type
Resolution
Ord/Res - Year
2019
Ord/Res - Number
02
City Property Name
Infrastructure Railroad
Project Name
Railroad Quiet Zones
Cross-Reference
BNSF
Original Hardcopy Storage
9C5
Quality Check
1/9/2019
Supplemental fields
Budget Number/Name
Railroad Quiet Zones
Test
RES 2019-02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ARTICLE 5. CONTRACTOR'S REPRESENTATIONS <br />In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following <br />representations: <br />5.1 CONTRACTOR has examined and carefully studied the Contract Documents, (including the <br />Addenda listed in paragraph 6.10) and the other related data identified in the Bidding <br />Documents including "technical". <br />5.2 CONTRACTOR has inspected the site and become familiar with and is satisfied as to the <br />general, local and site conditions that may affect cost, progress, performance or furnishing of <br />the Work. <br />5.3 CONTRACTOR is familiar with and is satisfied as to all federal, state and local Laws and <br />Regulations that may affect cost, progress and furnishing of the Work. <br />5.4 CONTRACTOR has carefully studied all reports of exploration and tests of subsurface <br />conditions at or contiguous to the site and all drawings of physical conditions relating to surface <br />or subsurface structures at or contiguous to the site (Except Underground facilities) which have <br />been identified in the General Conditions as provided in paragraph 4.2.1 of the General <br />Conditions. CONTRACTOR accepts the determination set forth in paragraph 4.2 of the <br />General Conditions. CONTRACTOR acknowledges that such reports and drawings are not <br />Contract Documents and may not be complete for CONTRACTOR's purposes. <br />CONTRACTOR acknowledges that OWNER and ENGINEER do not assume responsibility for <br />the accuracy or completeness of information and data shown or indicated in the Contract <br />Documents with respect to such reports, drawings or to Underground Facilities at or contiguous <br />to the site. CONTRACTOR has conducted, obtained and carefully studied (or assume <br />responsibility for having done so) all necessary examinations, investigations, explorations, <br />tests, studies, and data concerning conditions (surface, subsurface and Underground Facilities) <br />at or contiguous to the site or otherwise which may affect cost, progress, performance or <br />furnishing of the Work or which relate to any aspect of the means, methods, techniques, <br />sequences and procedures of construction to be employed by CONTRACTOR and safety <br />precautions and programs incident thereto. CONTRACTOR does not consider that any <br />additional examinations, investigations, explorations, tests, studies or data are necessary for <br />the performance and furnishing of the Work at the Contract Price, within the Contract Times <br />and in accordance with the other terms and conditions of the Contract Documents. <br />5.5 CONTRACTOR has reviewed and checked all information and data shown or indicated on the <br />Contract Documents with respect to existing Underground Facilities at or contiguous to the site <br />and assumes responsibility for the accurate location of said Underground Facilities. No <br />additional examinations, investigations, explorations, tests, reports, studies or similar <br />information or data in respect of said Underground Facilities are or will be required by <br />CONTRACTOR in order to perform and furnish the Work at the Contract Price, within the <br />Contract Time and in accordance with the other terms and conditions of the Contract <br />Documents, including specifically the provisions of paragraph 4.3 of the General Conditions. <br />5.6 CONTRACTOR is aware of the general nature of work to be performed by OWNER and others <br />at the site that relates to the Work as indicated in the Contract Documents. <br />5.7 CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the site, reports and drawings identified in the Contract <br />Documents and all additional examinations, investigations, explorations, tests studies and data <br />with the Contract Documents. <br />29 <br />2018 Louisville -Lafayette Quiet Zone Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.