Laserfiche WebLink
5.8 CONTRACTOR has given ENGINEER written notice of all conflicts, errors, ambiguities or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents and the written <br />resolution thereof by ENGINEER is acceptable to CONTRACTOR, and the Contract <br />Documents are generally sufficient to indicate and convey understanding of all terms and <br />conditions for performance and furnishing the Work. <br />ARTICLE 6. CONTRACT DOCUMENTS <br />The Contract Documents, which constitute the entire agreement between OWNER and <br />CONTRACTOR concerning the Work, are all written documents, which define the Work and the <br />obligations of the Contractor in performing the Work and the OWNER in providing compensation for <br />the Work. The Contract Documents include the following: <br />6.1 Invitation to Bid. <br />6.2 Instruction to Bidders. <br />6.3 Bid Form. <br />6.4 This Agreement. <br />6.5 General Conditions. <br />6.6 Supplementary Conditions. <br />6.7 General Requirements. <br />6.8 Technical Specifications. <br />6.9 Drawings with each sheet bearing the title: 2018 LOUISVILLE-LAFAYETTE QZ PROJECT <br />6.10 Change Orders, Addenda and other documents which may be required or specified including: <br />6.10.1 <br />Addenda No. 1 to 2 exclusive <br />6.10.2 <br />Documentation submitted by CONTRACTOR prior to Notice of Award. <br />6.10.6 <br />Notice of Award <br />6.10.7 <br />Performance Bond <br />6.10.8 <br />Labor and Material Payment Bond <br />6.10.9 <br />Certificates of Insurance <br />6.10.10 <br />Notice to Proceed <br />6.10.11 <br />Contractor's Proposal Request <br />6.10.12 <br />Contractor's Overtime Request <br />6.10.13 <br />Field Order <br />6.10.14 <br />Work Change Directive <br />6.10.15 <br />Change Order <br />6.10.16 <br />Application for Payment <br />6.10.17 <br />Certificate of Substantial Completion <br />6.10.18 <br />Claim Release <br />6.10.19 <br />Final Inspection Report <br />6.10.20 <br />Certificate of Final Completion <br />6.10.21 <br />Guarantee Period Inspection Report <br />CDOT Forms which shall be required include: <br />FORM 606 — Anti -Collusion Affidavit (fully executed prior to bid opening) <br />FORM 1413 — Bidders List <br />30 <br />2018 Louisville -Lafayette Quiet Zone Project <br />