My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2019 03 05
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2010-2019 City Council Agendas and Packets
>
2019 City Council Agendas and Packets
>
City Council Agenda and Packet 2019 03 05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:12:30 PM
Creation date
3/1/2019 2:04:43 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Packet
Original Hardcopy Storage
9A1
Supplemental fields
Test
CCAGPKT 2019 03 05
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Louisville <br />Treatment Plant Hail Damage RFP Specifications <br />October 9, 2018 <br />GENERAL <br />1. Contractors will use the provided Travelers insurance company's Scope of Work estimates as the basis <br />of work in conjunction with the City Specifications. Contractors will be responsible for field verification <br />of all measurements before submitting an RFP. <br />2. Contracts awarded above $50,000 total will require performance and payment bonds as required by <br />Colorado State statute. See bid forms for specifics. The contractor is responsible for the payment of <br />required bonds and must include them in base pricing. <br />3. RFP will include the following submittals in addition to the bid forms: <br />• Material and/or product sheets for all components of the RFP. Weights, gauges and <br />manufactures will be included. <br />• Warranty: copy of warranty preferred <br />4. Roof replacement will require a building permit. Fees will be waived for the permit but all other fees <br />are the responsibility of the contractor. Expect to have at a minimum a mid and final roof inspection. <br />Please call out any upgrades necessary in you proposal due to code changes since the installation of the <br />original roofing system. <br />5. All installations will meet the current applicable building code and the City of Louisville Design Criteria <br />for roofing. The City of Louisville, starting October 2018, will follow the 2018 IBC. <br />6. All color selections by owner unless match existing is called out <br />7. All roofing materials will be handled and installed as per the manufacturer's recommendations <br />8. All asphalt shingles will be "architectural laminate". Acceptable manufacturers: <br />• GAF <br />• IKO <br />• Certain Teed <br />• Malarkey <br />• Atlas <br />• Tamko <br />• Owens Corning <br />City of Louisville Treatment Plant Hail Damage RFP Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.