Laserfiche WebLink
9. Skylights — all curbed skylights will be domed double walled acrylic <br />10. All installed roofing systems will carry a 20 year warranty for materials and labor. No Damage Limit <br />warranties will receive the highest score. <br />11. Schedule will be based on time to installation from issue of Notice to Proceed. <br />12. RFPs will be scored based on the following: <br />• Pricing <br />• Product/material submittals <br />• Schedule <br />• References <br />• Warranty <br />• Onsite attendance <br />14. Clearly state any exclusion or modification from the scope of work on submitted proposals <br />BUILDING SPECIFICATIONS <br />The three treatment plant locations: <br />North Water Treatment: 1955 Washington Ave, Louisville <br />South Water Treatment: 7000 Marshall Rd, Louisville <br />Wastewater Treatment: 1555 Empire Rd, Louisville <br />A detailed scope of work has been provided by Travelers Insurance and is include for each <br />building. The expectation is that the detailed work be turnkey by the Contractor, except <br />for exclusions listed in the Specifications. <br />6 North Water Main <br />1. Remove and replace as per Travelers scope of work <br />2. Exclusions: <br />• Gas meter <br />• Swamp cooler cover <br />• HVAC cover <br />• Treatment Pools <br />• Red Generator <br />• Solar Panels <br />F17 North Water Gallon Tank Room (included in NW Main Scope) <br />1. Remove and replace as per Travelers scope of work <br />2. Exclusions: <br />• HVAC top cover <br />F4 North Water Mini Shed (included in NW Main Scope) <br />1. Remove and replace as per Travelers scope of work <br />2. Exclusions: None <br />City of Louisville Treatment Plant Hail Damage RFP Page 2 <br />