Laserfiche WebLink
g <br />Cityot <br />Louisville <br />COLORADO • SINCE 1878 <br />Memorandum I Department of Public Works <br />To: Utility Committee <br />From: Cory Peterson, Water Resources Engineer <br />Date: 3/15/19 <br />Re: Water CIP Overages and Budget Impacts <br />Summary: <br />With the recent responses from several water bid advertisements, a trend in bid prices that are in <br />excess of current budgets is developing. In addition, there are several new projects that have <br />been identified that will require a new allocation of funds. Given the significant impacts and the <br />number of projects, it was determined that a temporary hold should be placed on some of the <br />projects until the following objectives could be decided: <br />1) Reaffirm the commitment to these projects, <br />2) Discuss the potential impacts to future rates and, <br />3) Make any appropriate adjustments. <br />The intent of this holistic approach is to provide the Utility Committee with the entire scale of <br />the impacts as to maximize the information available in making the final determinations. <br />Projects: <br />Two projects, the control vault and metering technology, have already been presented and <br />approved by City Council. These projects include an overage of $209,147 for the control vault <br />and the addition of $159,350 for the metering technology pilot programs. The following is a <br />breakdown of the remaining identified projects starting from the largest financial impact. <br />• The Southern Water Supply Pipeline (SWSP) has a design budget of $129,000 for 2019 <br />and a construction estimate of $1,324,000 in 2020. The SWSP is the only connection of <br />the City's CB-T and Windy Gap water rights. Without additional capacity the City will <br />be unable to fully utilize these supplies. Staff advertised for design services in late 2018 <br />and received responses ranging from $126,000 to $344,000. The most responsive and <br />staff recommended proposal has a projected cost of $287,000 inclusive of contingency. <br />The higher cost is being driven by the complexities of the project, including coordination <br />with other entities and several major crossing including Hwy 42 and the railroad. <br />Early discussions with several of the prospective design firms suggest that the future <br />construction cost is underfunded. Costs for similar projects along the Front Range were <br />evaluated and applied to specific site conditions and a new estimate of $3 million was <br />developed. The revised projection, results in an unaccounted for increase in the budget of <br />$1.8 million. <br />Ls <br />15 <br />