My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parks and Public Landscaping Advisory Board Agenda and Packet 2019 10 03
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PARKS AND PUBLIC LANDSCAPING ADVISORY BOARD (fka HORTICULTURE FORESTRY ADVISORY BOARD)
>
2000-2019 Horticulture and Forestry Advisory Board Agendas and Packets
>
2019 Parks and Public Landscaping Advisory Board Agendas and Packets
>
Parks and Public Landscaping Advisory Board Agenda and Packet 2019 10 03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 8:40:38 AM
Creation date
10/1/2019 11:07:05 AM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cityr Louisville <br />PARKS, RECREATION & OPEN SPACE <br />Memorandum <br />To: Parks and Public Landscaping Advisory Board <br />From: Allan Gill, PLA, Park's Project Manager <br />Date: October 3, 2019 <br />Re: Playground Replacements Project, Elephant and Keith Helart <br />Parks — Open House Review <br />Information and Summary: <br />The playgrounds at Elephant Park and Keith Helart Parks are older and replacement parts for <br />the play equipment are no long available. Both playgrounds have access issues and do not <br />meet the Americans with Disabilities Act (ADA) requirements. The goal of the playground <br />replacements project is to replace the old and out dated playgrounds with new playgrounds <br />that are inviting, fun, meets or exceeds ADA requirements and creates a positive first <br />impression of Louisville's parks system. <br />City Council approved the playground replacements project contract for elephant Park and <br />Keith Helart Park at their July 9 meeting. The contract has been awarded to the design -build <br />team of HPM Inc. as the contractor and The Architerra Group as the landscape architect. <br />An open house for each park was scheduled on Saturday September 28 for neighbors and <br />City residents. The conceptual drawings in your packet were presented at the open houses to <br />gather ideas and generate discussion about the future parks and what they might look like. <br />On Monday September 30 staff is planning to meet with the design -build team to review the <br />information collected at the open houses and bring that information to the board for further <br />discussion. <br />Funding: <br />The City's bi-annual budget currently includes funding of $280,000 in both 2019 and 2020. <br />The budget includes design, construction and all other aspects of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.