Laserfiche WebLink
City,/ <br />Im Louisville <br />COLORADO • SINCE 1878 <br />LOUISVILLE REVITALIZATION <br />COMMISSION <br />SUBJECT: <br />PRESENTATION ON HW 42 AND SHORT STREET <br />IMPROVEMENTS <br />DATE: DECEMBER 9, 2019 <br />PRESENTED BY: HEATHER BALSER, LOUISVILLE CITY MANAGER <br />MEGAN PIERCE, ECONOMIC VITALITY DIRECTOR <br />KURT KOWAR, PUBLIC WORKS AND UTILITIES DIRECTOR <br />SUMMARY: <br />The 2011 State Highway 42 PEL included a traffic signal at SH 42 and Short Street, <br />which was determined necessary for developments on both sides of the corridor and <br />downtown access. The City has been working since early 2018 on the installation of the <br />traffic signal, and the project is now under construction. <br />The City recently appointed Golden -based GoodLand Construction to undertake the <br />improvements at the intersection of State Highway 42 and Short Street. Construction <br />began in October, and will continue through the winter and spring. The project is <br />scheduled for completion in spring/summer 2020. The construction will require the lanes <br />on SH42 and Short Street to be shifted at various points although no complete lane <br />closures are anticipated. <br />The improvements include medians, new curb and gutter, sidewalks and pedestrian <br />crossing access, signal posts, arms and heads, utility location/relocation, and signage. <br />Below is a design schematic of the intersection improvements that will be installed. <br />Nda. <br />Taiderte isvpreinr ly lS <br />hpmNe P. barn IM10 <br />SHORT <br />STREET <br />SIGNAL PHASING <br />L. <br />SIGNS <br />❑7 ❑3 <br />1 <br />OS' MV <br />M. MA <br />