Laserfiche WebLink
screening for the loading docks facing Taylor Avenue. The plan calls for planting to <br />highlight vehicular entrances to the property as well as the corner of CTC Boulevard <br />and Taylor Avenue. Plantings frame building entrances and break-up parking lot rows. <br />The landscaping plan provides native seeding, a trail connection, and a seating area in <br />the conservation easement area and Outlot E along Highway 42. The conservation <br />easement and Outlot E act as a large 110' landscaping buffer between development <br />and the public right-of-way. <br />The development provides 175 initial parking spaces, at a ratio of 2 spaces/1000 sf, <br />with the ability to add spaces in lieu of truck access for up to 297 spaces total (3.5 <br />spaces/1000 sf). The proposal distributes parking around all sides of the building, with <br />potential deferred parking on the south side of the building in the truck loading area. The <br />CDDSG requires a parking ratio of 1 space/1000 sf for warehouse uses, and 4 <br />spaces/1000 sf for office uses. Because there is no known tenant at this point, the site <br />plan provides parking at a quantity above the requirement for warehouse, but below the <br />requirement for office. If the building was a mix of both office and warehouse uses, it <br />could be no more than 71,000 sf of office, assuming all of the deferred parking was built <br />to create 297 spaces. Staff will evaluate parking needs of particular uses at the time of <br />tenant finish building permit review, to determine when the deferred parking is <br />necessary. <br />The building and parking areas meet all setback requirements in the CDDSG. However, <br />the applicant requests a waiver for relief from the required building setback of 25' along <br />the western property line to allow solar carports over parking spaces, resulting in a <br />setback of roughly 11'-6" where carports are added. The parking lot on this western <br />edge meets the minimum setback of 10'-0". The plans do not indicate specific locations <br />for these carports, but note that they could be added to the north and west sides of the <br />parking lot. A waiver is only needed for carports on the west side of the parking lot, <br />where they would encroach on the 25' required side setback. <br />Emergency access meets the requirements. <br />Lot 1, The Business Center at CTC Replat J, and PUD Page 5 of 15 <br />PC — December 12, 2019 <br />