Laserfiche WebLink
Figure 3: PUD Site Plan <br />1 <br />zs6r <br />BUILDING FOOTPRINT. <br />--.83,615.S:F.. <br />-_- r�s[ncxr - _.. <br />TAYLOR AVENUE <br />417 <br />CTC BOULE <br />Architectural Design <br />The applicant proposes construction mainly consisting of tilt up concrete panels, with <br />interior steel columns and bar joists. The rectangular building footprint is roughly 515' by <br />160'. The north elevation of the building has the primary pedestrian entries, more <br />transparency, and more articulation. The south elevation of the building provides <br />loading/truck access, service areas, and less transparency. The east and west <br />elevations have a moderate degree of transparency and articulation. <br />Projections on the north elevation, southeast corner, and southwest corner break up the <br />overall mass of the building. The building roof is flat, but the roofline varies with changes <br />in parapet height. Windows and entries are clustered at the corners of the building and <br />on the north elevation. Entry and window framing, reveal lines, and changes in material <br />and color provide further articulation on the exterior of the building. <br />The building also includes canopies, concrete screen walls, vertical panels, and two <br />wood trellises to highlight building entries and create visual interest. Building materials <br />and architectural treatments include the use of concrete form -liners, wood siding, <br />architectural metal panels, and fiber cement board siding. <br />Lot 1, The Business Center at CTC Replat J, and PUD Page 6 of 15 <br />PC — December 12, 2019 <br />