My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2008 10 09
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2008 Planning Commission Agendas and Minutes
>
Planning Commission Agenda and Packet 2008 10 09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:32:24 AM
Creation date
3/25/2020 3:24:54 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
202
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PARTY OF FIVE, LLLP <br />P. O. Box 983 <br />Broomfield, CO 80038 <br />Phone: 303-404-3225 <br />Fax: 303-404-0778 <br />E-Mail: jon.file(ai)comcast.net <br />Sean McCartney <br />Principal Planner <br />749 Main Street <br />City of Louisville, CO 80027 <br />Dear Mr. McCartney <br />SEP ' 0 2008 <br />PLANNING <br />We have completed the changes requested by City staff in both of the comment letters <br />from yourself and Mr. Duffin. <br />The following address the changes as requested. <br />Public Works/Wastewater: all businesses that locate in the building, will submit the <br />required waste survey form. <br />A00 <br />1. Cover sheet has been changed to reflect that the titles correspond to the attached <br />sheets. <br />2. Bicycle parking calculations have been added and a bicycle parking area added to <br />A01. <br />3. Table has been added for setbacks and height of building. <br />A01 <br />1. Area has been added in the South East corner of the building. <br />2. Landscape islands have been added <br />3. Site Plan has been removed. <br />A04 <br />1. Color and material tags have been added. <br />2. Additional height measurements have been added. <br />3. Rooftop units will be screened from view. <br />A05 <br />1. 02/A05 has been labeled "Proposed wall signs". <br />2. 03/A05 has color and material tags. <br />LO1 <br />1. Area along the West, North and East is now shown with Mulch. Erie cobble was <br />added to the front of the build to make it more uniform with the rest of the front. <br />2. Plant schedule shows a separate tree and shrub schedule. Some people call the <br />Emerald Green arborvitae a tree, but we are using them as a hedge to block out the <br />loading dock and transformer. Our Lilac plants are a shrub but we have trimmed <br />them like trees and they are pretty large and mature. I have listed both as shrubs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.