My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Minutes 2014 07 10
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2014 Planning Commission Agendas Packets Minutes
>
Planning Commission Minutes 2014 07 10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2020 1:22:39 PM
Creation date
7/9/2020 11:07:54 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
7/10/2014
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />July 10, 2014 <br />Page 4 of 14 <br />Robinson answers parking relies on current BNSF lease. There is precedence with the current <br />tenant who requested SRU to use BNSF lease to satisfy parking requirement. If lease ends, it <br />could be a potential problem. Lease is long term and corresponds to the life of the development. <br />Regulations allow for offsite parking so if lease is lost, they would find additional spaces or <br />pursue fee in lieu. <br />Rice says that all setback waivers being requested are on property that backs up to railroad <br />tracks. Robinson answers yes. <br />Rice asks about 35 feet waiver for screening which says "to extend beyond the 35 feet". How <br />far beyond. <br />Robinson says there is no final number and it will come out in final presented in final PUD. <br />Pritchard asks about BNSF lease area. Does BNSF lease impact City's plan for additional <br />parking. <br />Robinson answers their potential future lease is the same as the City's future lease. There is <br />current discussion between the City and BNSF. <br />Applicant Presentation: <br />Erik Hartronft, Architect, Louisville Mill Site LLC, 950 Spruce Street, Louisville, residence at 817 <br />Lincoln, Louisville, CO. Partner is Randy Caranci at Louisville Mill Site LLC. <br />• Randy Caranci is owner of Lot 1 where warehouse facility is located. <br />• Louisville Mill Site LLC has contract with the City to purchase property if successful plat <br />and PUD are achieved as well as achieve stabilization and mitigation work on the Grain <br />Elevator. Mitigation phase complete. Currently tearing into foundation around and within <br />building so structural stabilization continues. New foundation installed, building leveled, <br />and has new siding. <br />• Applicant feels the site is an anchor for the south end of Downtown. The site contains a <br />unique asset. Goal is to take elevator to a restored condition, have it a useful building, <br />contribute to tax rolls, have a private and/or shared museum space, and have lease <br />space. <br />• Caranci warehouse building on the south built on an old RR spur and part of the Grain <br />Elevator overlaps onto that piece of property. Both sites need to be developed at the <br />same time. The old Napa building will come down with new building to be built. <br />• Historically, there was a "porte cochere" on the front of the Grain Elevator. Applicant <br />wishes to restore the "porte cochere" on the front and enclose it with glass. Applicant <br />wants to build an addition on the back to house a small kitchen, restrooms, and utility <br />space for a future restaurant. <br />• Lot 1 warehouse will have addition to change look of the front. <br />• Lot 3 with a new building will be called the Mill Site building. <br />• Leased area in discussion with the City and BNSF to try to extend lease to the extent of <br />applicant's site. This will make a more efficient parking area and provide extra parking. <br />• Main design driver on project is Grain Elevator treatment. Property will be designated a <br />landmark site and then structure will be a historic structure and landmarked. Applicant <br />sees proposal as rehabilitation, not pure restoration, because of adaptive reuse of the <br />building. Department of Interior Guidelines for Rehabilitation of Historic Structures <br />allows for different uses so Grain Elevator does not have to be restored as a working <br />grain elevator. <br />• There will be a green space created in front of the Grain Elevator which provides a view <br />corridor from the north and south. This creates a no -build zone and conservation <br />easement between the development company and the City. Access to the site from the <br />north and south expands the no -build zone to be wider. <br />
The URL can be used to link to this page
Your browser does not support the video tag.