Laserfiche WebLink
Planning Commission <br />Meeting Minutes <br />July 14, 2016 <br />Page 4 of 33 <br />• Fence and trail connection per City's Open Space standards <br />SIGNS <br />• 2 monument signs — one at each entrance per CDDSG <br />• V-shaped monument sign with site name <br />• Balfour tree logo on small shed <br />SETBACKS WAIVERS <br />• Accessory structure front yard setback 35 feet to 26 feet <br />• Parking setback along Plaza Drive from 15 feet to 10 feet <br />• Side yard setback for fire access (solution development with Public Works and Louisville <br />Fire District) <br />HEIGHT WAIVER <br />• Extend portion of structure beyond the 35 foot height requirement to a maximum of 52 <br />feet <br />• Staff is concerned about building massing and privacy and recommends a condition of <br />approval that mature landscaping be installed at the time of construction <br />FISCAL IMPACT <br />• Model estimates a cumulative net positive fiscal impact +$296,000 on the City over a 20- <br />year period <br />HISTORIC PRESERVATION COMMISSION <br />The Historic Preservation Commission (HPC) held a meeting on April 18, 2016 and had the <br />following comments: <br />• Every effort should be made to preserve the historic structure at 1800 Plaza Drive by <br />moving it to another location. The Commission placed a stay of 180 days on the <br />demolition request. <br />• The preservation of the "historic element" associated with the Hecla Mine is an <br />appropriate way to honor the history of the area. <br />The HPC expressed concern about the height of the structure but felt that it made sense at that <br />location and the views across Hecla Lake to the mountains. <br />Staff Recommendations: <br />Staff recommends approval of the requested Planned Unit Development and final Plat with the <br />following conditions: <br />1. Prior to the City Council hearing, the applicant shall incorporate a minimum of six mature <br />trees into the overall landscape plan on the east and northeast side of the site. The <br />trees will be a mix of deciduous and evergreen trees which will provide a mature <br />landscape buffer and appropriate transition to the surrounding public open space and <br />single family residential neighborhood <br />Commission Questions of Staff. - <br />Rice says the issues we have before us are the three setback waivers. It is no secret that the <br />real controversy has to do with the height waiver. We are being asked to change the zoning <br />height of 35' and move it to 52', which is a 17' increase. What is the standard I have as a <br />Commissioner to decide whether this waiver in height restriction is allowed under the code? <br />Trice says there is clear language in Section 17.20.120 which lists all criteria to review for any <br />type of waiver request. The criteria Staff felt were most appropriate to apply to this situation <br />were the criterion of appropriateness to the surrounding area and the criterion looking at bulk. It <br />relates to whether this fits to this particular site. Does the spirit and intent of these criteria <br />continue to match this particular project? <br />Rice says as I understand it, we have facilities to the west of this proposed development that <br />are 50' in height. <br />Trice says they are at least 50', and some of them are taller. <br />Rice asks how did we get there? <br />Trice says the applicant went through the same waiver request process. <br />