My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Utility Committee Agenda and Packet 2020 07 28
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
UTILITY COMMITTEE (pka: Water Committee)
>
2020 Utility Committee Agendas and Packets
>
Utility Committee Agenda and Packet 2020 07 28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 11:39:15 AM
Creation date
8/13/2020 11:31:36 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
7/28/2020
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: HBWTP Recycle Tank Maintenance Submitted By: Public Works Version: 3/3/2020 <br />Program(s): Sub-Program(s): Funding Source(s): Percent <br />Utilities Water Water Utility Fund 1000/ <br />100°G <br />-.1 <br />Equipment or <br />Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 <br />Six -Year <br />Project Costs <br />2021 2022 2023 2024 2025 2026 <br />Total <br />Land Acquisition <br />- - - - - - <br />- <br />Design & Engineering <br />- - - - <br />- <br />Other Prof Services <br />- - - - - - <br />- <br />Construction <br />150,000 - - - - <br />150,000 <br />Other Equip/Project Costs <br />- - - - - - <br />- <br />Capital Equipment Purch <br />- - <br />- <br />Contingency <br />45,000 - - <br />45,000 <br />195,000 - - - <br />195,000 <br />Total Costs (Gross) <br />Grants or Other <br />Off -Setting Revenue <br />- - - <br />Impact to Annual <br />Maint/Operating Costs - - - <br />- <br />Description & Proposed Funding: <br />Equipment/Project Description: <br />This CIP funds the cleaning and inspection of the Backwash Recycle Tank <br />at the Howard Berry Treatment Plant. In addition, funds will be allocated <br />For minor repairs and painting. <br />Project revenue or grants that will support the project and the <br />impacts to the operating budget: <br />No grants have been identified at this time. Annual maintenance is not <br />expected to change. <br />Reference to Plan being implemented (i.e., Master Plan): <br />E Justification and Alignment with Program/Sub-Program Goals & Key Performance Indicators: I <br />The Backwash Recycle Tank at the Howard Berry Water Treatment Plant is utilized to contain process water removed during filter <br />cleaning cycles and stabilize it for recycle or sanitary sewer discharge. Over time the tank collects sediment which has to be periodically <br />removed. Additionally, operational and structural components can deteriorate due to corrosion and from normal operation. The <br />backwash tank was constructed in 1992 and requires regular maintenance, cleaning and inspection to ensure proper operation. Failure <br />of the tank structure or equipment would prevent the backwash operations and would ultimately render the entire plant inoperable. <br />Department Priority Ranking: High Request Number: (Finance Use <br />
The URL can be used to link to this page
Your browser does not support the video tag.