My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Utility Committee Agenda and Packet 2020 07 28
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
UTILITY COMMITTEE (pka: Water Committee)
>
2020 Utility Committee Agendas and Packets
>
Utility Committee Agenda and Packet 2020 07 28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 11:39:15 AM
Creation date
8/13/2020 11:31:36 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
7/28/2020
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: Harper Lake Pump Station <br />Submitted By: Public Works Version: 5/27/2020 <br />Program(s): Sub-Program(s): <br />Funding Source(s): Percent <br />Utilities Water <br />Water Utility Fund 100% <br />100% <br />Equipment or <br />• <br />Year 1 Year 2 <br />• <br />Year 3 Year 4 Year 5 Year 6 <br />Six -Year <br />Project Costs <br />2021 2022 <br />2023 2024 2025 2026 <br />Total <br />Land Acquisition <br />- - <br />- - - - <br />- <br />Design & Engineering <br />- - <br />- - - 95,000 <br />95,000 <br />Other Prof Services <br />- <br />- - - <br />- <br />Construction <br />- - <br />- - - - <br />- <br />Other Equip/Project Costs <br />- <br />- - <br />- <br />Capital Equipment Purch <br />- - <br />- - - - <br />- <br />Contingency <br />- <br />- <br />- <br />- <br />- - 95,000 <br />95,000 <br />Total Costs (Gross) <br />Grants or Other <br />Off -Setting Revenue <br />- <br />- - - <br />- <br />Impact to Annual <br />Maint/Operating Costs <br />- - <br />Description & Proposed Funding: <br />Equipment/Project Description: <br />This project will fund the multi -year project of the inspection, evaluation <br />and repair of the Harper Lake Pump Station. The evaluation will start in <br />2021, with the major construction activities scheduled for 2022. <br />Project revenue or grants that will support the project and the <br />impacts to the operating budget: <br />No grants have been identified at this time. Annual maintenance is not <br />expected to change. <br />Reference to Plan being implemented (i.e., Master Plan): <br />Justification and Alignment with Program/Sub-Program Goals & Key Performance Indicators: <br />The Harper Lake Pump Station was constructed 34 years ago and transfers water from Harper Lake to Louisville Reservoir for treatment. <br />This Project will evaluate and repair equipment as needed. This work will include the removal of all three vertical turbine pumps and <br />motors, as well as inspection of the wet well and all piping in the station. Additionally, the building and structure will be evaluated. Lastly, <br />electrical, security, controls and communication system will be reviewed for upgrade. This pump station is critical to supplying raw <br />water for treatment during summer high demands. The failure of <br />the equipment in the station could potentially result in an inadequate <br />supply of water to the city and possible water restrictions. <br />Department Priority Ranking: High <br />Request Number: (Finance Use) <br />
The URL can be used to link to this page
Your browser does not support the video tag.