My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2013 08 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2013 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2013 08 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 9:30:13 AM
Creation date
11/12/2020 5:35:00 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />July 11, 2013 <br />Page 4 of 10 <br />McCartney provided details of the density calculation. Discussion included a <br />summary of the LMC Section 17.14.090.C.1.a: Calculated Gross Density. Residential <br />density in Table 3 above is calculated as gross density, and shall be measured as an <br />average including over the gross land area of only the residential portion of the site <br />as determined by the City), plus one-half (1/2) the area of any adjacent street or <br />alley right of way. For developments with mixed-use buildings containing both <br />residential and nonresidential uses, residential density is measured including the <br />gross land occupied by the entire mixed-use building. <br />McCartney reviewed the traffic with the following points: <br />Project will coincide with the redevelopment of HWY 42 scheduled to begin in <br />2016. <br />HWY 42 is to maintain it currently LOS. <br />1. 2,484 total vehicle trips per day <br />a. Morning: 68 enter/132 exit <br />b. Evening: 142 enter/88 exit <br />Walkable Community <br />Signal at Short Street and Hwy 42 will benefit ingress and egress <br />McCartney provided the following Transit Oriented summary: <br />Provides sight lines and pedestrian access from Short Street to future rail <br />platform <br />Provides circulatory routes for bus transit <br />Provides direct access to South Street Underpass <br />City continues discussions with RTD to determine parking alternatives through <br />Northwest Area Mobility Study (NAMS) <br />300 transit spaces still planned for Louisville Sports Complex <br />McCartney summarized the requested waivers: <br />1. Maximum Building Length Along Street: The applicant is proposing building <br />portals with pedestrian bridges on the 3rd floor leaving the building notched out <br />on ground floor. <br />2. Street Sections: Skinny Streets to reduce speeds, pedestrian crossings, costs <br />and heat radiation. <br />3. Minimum Lot Width: For platting purposes only – outward appearance of <br />building will be standard townhome design <br />McCartney concluded with the following recommendations: <br />1. The requested waivers are appropriate under LMC Section 17.14.090 to allow <br />for an effective development given the location and surrounding land uses. <br />The applicant is also requesting and staff is recommending the following <br />changes to Chapter 17.14 of the LMC: <br />a. Adjustments to the “Exhibit A” Land Use Plan to allow for a more <br />connected street network and proposed land uses, and <br />b. Changing the land designated for RTD parking to Mixed-Use <br />Residential (consistent with the approved rezoning Ordinance 1535, <br />Series 2008) <br />2. Conditions of approval: <br />a. The negotiation process for the ROW extension through the Tebo <br />property is to be completed prior to the submittal of the final plan.
The URL can be used to link to this page
Your browser does not support the video tag.