My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2021 02 11
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2021 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2021 02 11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2021 11:15:49 AM
Creation date
2/23/2021 10:10:55 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
2/11/2021
Doc Type
Boards Commissions Committees Records
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
for additional interest. The building is 20-feet tall and includes parapets that will screen <br />the roof -top mechanical units. <br />The 100,000 sf industrial building is constructed of tilt -up concrete. Portions of the <br />exterior will be clad with wood siding and fiber cement panels along with aluminum <br />canopies and roof accents. Three entry areas are shown on the west frontage to <br />accommodate a mix of tenants as the building leases out. <br />The PUD proposes 18 parking spaces for the convenience store, one of which is ADA <br />accessible. The CDDSG requires 16 spaces minimum. Parking for the industrial <br />building assumes a mix of warehouse and retail/office uses with a total of 196 parking <br />spaces, 7 of which are ADA accessible. The parking ratio for the site is 2 spaces per <br />1,000 sf. Similar to properties in the CTC, parking will be managed through review of <br />the building permit and business license approvals to ensure future tenants' parking <br />needs can be accommodated on the property. <br />The proposal includes a request for three waivers. The first is a request for relief from <br />the architectural building material standard for the east elevation (rear) facing the future <br />trail and BNSF railroad. The second is for relief from the building perimeter landscaping <br />requirement due to geotechnical concerns related to water at the foundation and the <br />third is related to private street tree requirements. Full descriptions of these requests <br />and rationale for staff's findings are included in the analysis section below. <br />ANALYSIS: <br />Preliminary and Final Planned Unit Development <br />The PUD is regulated by the CDDSG, Chapter 17.28 of the municipal code, and the St <br />Louis Parish and Commercial Park General Development Plan, 2nd Amendment. <br />St Louis Parish and Commercial Park General Development Plan, 2nd Amendment <br />Analysis <br />St Louis Parish and Bolder Innovation Campus PUD, SRU and Plat Page 7 of 16 <br />PC — February 11, 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.