Laserfiche WebLink
Initial Utility CIP Request - WATER <br />2020 Rollover CIP / 2021 Pending Amendment <br />No -Change <br />2021 New CIP Request <br />SBR Ditch Lining <br />$ 279,973 <br />$ 218,500 <br />$ 143,750 <br />$ 642,223 <br />Water Line <br />$ 1,500,780 <br />$ 391,000 <br />$ 540,500 <br />$ 724,500 <br />$ 494,500 <br />$ 500,000 <br />$ 4,151,280 <br />$ 500,000 <br />Meter Replacement <br />$ 79,280 <br />$ 1,560,000 <br />$ 1,560,000 <br />$ 3,199,280 <br />Marshall Lake Sediment Control <br />$ 710,000 <br />$ 710,000 <br />Water Rights <br />$ 1,050,000 <br />$ 1,250,000 <br />$ 1,250,000 <br />$ 250,000 <br />$ 500,000 <br />$ 500,000 <br />$ 4,800,000 <br />$ 500,000 <br />Windy Gap <br />$ 1,400,000 <br />$ 797,000 <br />$ 797,000 <br />$ 797,000 <br />$ 639,000 <br />$ 1,302,000 <br />$ 5,732,000 <br />$ 1,302,000 <br />Electrical Assessment <br />$ 132,500 <br />$ 100,000 <br />$ 232,500 <br />SWSP Transmission Capacity <br />$ 2,700,000 <br />$ 2,700,000 <br />Water Tank Maintenance <br />$ 377,320 <br />$ 30,000 <br />1 <br />$ 30,000 <br />1 $ 437,320 <br />PRV Replacement <br />$ 100,000 <br />$ 100,000 <br />Fluoride Equipment Replacement <br />$ 239,000 <br />$ 239,000 <br />Raw Water Quality Stud <br />$ 200,000 <br />$ 200,000 <br />AugWater Pipeline and AugStation <br />$ 1,000,000 <br />$ 1,000,000 <br />Harper Lake Pump Station <br />$ 95,000 <br />$ 2,320,000 <br />$ 2,415,000 <br />Louisville Lateral Ditch Piping <br />$ 3,120,000 <br />$ 3,120,000 <br />Pump Replacement <br />$ 84,000 <br />$ 276,000 <br />$ 17,000 <br />$ 377,000 <br />SCWTP Raw Water Valve Replacement <br />$ 35,000 <br />$ 35,000 <br />Backhoe Replacement <br />$ 78,750 <br />$ 78,750 <br />Asphalt Patch Truck <br />$ 80,400 <br />$ 80,400 <br />Water Break Repair Vehicle <br />$ 89,250 <br />$ 89,250 <br />Chemical Mixing Replacement <br />$ 32,500 <br />$ 32,500 <br />Process Pipe Evaluation <br />$ 80,000 <br />$ 50,000 <br />$ 50,000 <br />$ 50,000 <br />$ 230,000 <br />Utility Master Plan <br />$ 125,000 <br />$ 125,000 <br />Valve Exercise Trailer <br />$ 54,390 <br />$ 54,390 <br />Filter Media Replacement <br />$ 616,000 <br />$ 616,000 <br />WTP Vehicle Replacement <br />$ 80,000 <br />$ 50,000 <br />$ 130,000 <br />HBWTP Drying Beds Maintenance <br />$ 221,000 <br />$ 221,000 <br />Instrumentation Replacement <br />$ 260,000 <br />$ 260,000 <br />Channel Ditch Maintenance 60% <br />$ 15,000 <br />$ 15,000 <br />$ 15,000 <br />$ 15,000 <br />$ 60,000 <br />$ 15,000 <br />Reservoir Inundation Map Update <br />$ 60,000 <br />$ 60,000 <br />FLowCAM <br />$ 175,000 <br />$ 175,000 <br />As -Built Drawing Update <br />$ 40,000 <br />$ 40,000 <br />Hi h2one Tank Securi <br />$ 60,000 <br />$ 60,000 <br />TOTALS <br />$ 10,136,253 <br />$ 3,354,390 <br />$ 8,424,250 <br />$ 3,581,500 <br />$ 4,299,500 <br />$ 2,607,000 <br />$ 32,402,893 <br />$ 2,317,000 <br />PROPOSED CHANGES $ 7,140,103 $ 871,000 $ 5,801,000 $ 1,581,000 $ 1,068,000 1 $ 3,605,500 $ 12,855,603 $2,317,000 <br />