My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2021 12 07
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2021 City Council Agendas and Packets
>
City Council Agenda and Packet 2021 12 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 8:18:50 AM
Creation date
12/6/2021 4:45:58 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
12/7/2021
Doc Type
City Council Packet
Original Hardcopy Storage
9C3
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
EMERGENCY REPAIR: <br />TS-7 Un-Scheduled And Emergency Repairs: <br />All malfunctions of a controller and its auxiliary equipment shall be considered an emergency unless <br />otherwise identified by the Owner. Equipment malfunctions, and/or damage, which, in the opinion of <br />the Owner, constitutes a serious hazard or inconvenience to the public shall be considered an <br />emergency. Such malfunctions or damage may include, but not necessarily be limited to, situations <br />where: <br />(1) All red indications are out including bulbs, lenses or LEDs, for any one traffic movement; <br />(2) Signal heads give conflicting indications to any intersection approach; <br />(3) A signal has been knocked down; <br />W.L. Contractors currently has the maintenance contracts for the majority of the Denver metro areas <br />' and has technicians daily in each area performing scheduled maintenance and repairs. Because of this <br />presence W.L. believes we will be able to respond to emergency trouble calls within a one hour <br />period.. <br />Contractor shall be entitled to charge Owner for a minimum of one hour for the labor and equipment <br />actually used to make any such repair in the event that the repair work takes less than one hour to <br />complete. In the event that the repair work exceeds one hour, the additional time shall be charged in <br />one-half hour increments. The minimum of one hour for labor and equipment does not apply to <br />Scheduled Preventive Maintenance. The Owner shall pay Contractor for the materials, parts and/or <br />supplies actually used by Contractor in making any such repair pursuant to this contract. <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.