My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2021 12 07
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2021 City Council Agendas and Packets
>
City Council Agenda and Packet 2021 12 07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2022 8:18:50 AM
Creation date
12/6/2021 4:45:58 PM
Metadata
Fields
Template:
City Council Records
Meeting Date
12/7/2021
Doc Type
City Council Packet
Original Hardcopy Storage
9C3
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TS-S Extra Work: <br />The term "extra work" shall be understood to mean and to include all work that may be required by the <br />Owner which is not preventive maintenance or unscheduled and emergency repair work. Examples of <br />extra work may include, but not be limited to, the following: <br />1. DeveIopment of Traffic Signal Specifications, as completed for Adams County, Arapahoe <br />County, Commerce City, and Littleton UPS specifications. <br />2. Modifications to an existing signalized intersection. This would typically describe intersection <br />reconstruction requiring the relocation of all or part of the existing signal equipment. This <br />would also include the installation of signal equipment not presently found at an existing <br />signalized intersection. (Example: The installation of loop detectors on an approach with no <br />existing detection). <br />3. Installation of equipment and/or materials for a new signal installation location, either complete <br />or partial. <br />4. Changes in signal timing. <br />5. Painting of mast -arms, span -wire poles, control cabinets, signal heads and visors. <br />6. Installation of School Speed Limit Flashers and warning beacons. <br />7. Installation of pedestrian crossing signs. <br />8. Acting as City's agent in the review or inspection of signals not constructed as part of this <br />contract. <br />9. Fiber Optic Splicing and Terminating. <br />TS-9 Time And Material Proposal: <br />For any installations or extra work, the Contractor may submit a proposal for acceptance or rejection <br />by the Owner. The proposal shall include estimated time, equipment and materials. If the proposal is <br />accepted by the Owner, the installation or extra work would be performed by the Contractor on a time <br />and materials basis for a price not to exceed that set forth in the proposal. Changes by the Owner, <br />which occur after the proposal has been submitted, will be considered as changes to the proposal. <br />westm <br />WARRANTY: <br />W.L. Contractors, Inc. warrants all work performed and equipment installed for one year from date of <br />acceptance by the City of Louisville. <br />42 <br />
The URL can be used to link to this page
Your browser does not support the video tag.