Laserfiche WebLink
5. Any repair or replacement of compromised water and/or sewer piping. <br />6. Restoration of Harper Lake infrastructure including restroom facility, fencing, and parking <br />lot. <br />7. Restoration of Harper Lake trees, turf, and landscaping and appropriate irrigation. In <br />particular, restoration of the trees and turf where families once used to sit in the grass, in the <br />shade, and picnic before the city allowed the area to deteriorate. <br />8. Restoration of Sunflower Park with trees, landscaping, turf, and bench and appropriate <br />irrigation. <br />9. Replanting of Washington Avenue trees and streetscape with appropriate irrigation. <br />10. Replanting of McCaslin trees and streetscape with appropriate irrigation. <br />In addition to the CIP projects above, please consider immediate funding to prepare a city-wide <br />analysis of wildfire preparation and protection together with Boulder County and the Louisville <br />Fire Protection District. Also seriously commit to mowing open space big time and conducting <br />prescribed burns when the weather cooperates. <br />Sincerely, <br />Sue <br />7 <br />