My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Minutes 1983 08 02
PORTAL
>
CITY COUNCIL RECORDS
>
MINUTES (45.090)
>
1970-1999 City Council Minutes
>
1983 City Council Minutes
>
City Council Minutes 1983 08 02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 2:31:21 PM
Creation date
7/7/2009 3:48:59 PM
Metadata
Fields
Template:
City Council Records
Doc Type
City Council Minutes
Signed Date
8/2/1983
Original Hardcopy Storage
7C3
Supplemental fields
Test
CCMIN 1983 08 02
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />8/2/83 <br /> <br />Page -7- <br /> <br />Director Rupp <br />Slide Presentation <br /> <br />Advised that the proposal was a 2.66 acre <br />site, zoned Community Commercial, located <br />at the southwest corner of State Highway 42 <br />and pine Street; all utilities are avail- <br />able to the site; there are four proposed <br />buildings, 2 retail, I office, and group <br />lodge facility. The applicant is proposing <br />to lease the old railroad right-of-way from <br />the City for parking. In exchange the developer <br />will landscape and maintain the property. <br />Planning Commission added the condition to <br />the approval that there be an architectural <br />review by staff and that signage also be <br />reviewed prior to building permits being <br />issued. Revised building elevations have <br />been supplied since the Planning Commission <br />meeting. The revised plan represents a <br />building facade that is less elaborate than <br />what was previously proposed. The project <br />is located on a major entry to the down- <br />town and the staff believes this project <br />should portray a positive image of the City, <br />and is in compliance with the comp plan. <br />There are 3 points of access into the develop- <br />ment and the parking is in access of the <br />Louisville Code. At the northeast corner <br />of the site a sizable area is being left for <br />open space to compliment an entry-way into <br />the downtown portion of Louisville. This <br />will be landscaped and maintained by the <br />developer and there is no building proposed <br />at that location. Staff did have concerns <br />with roof-top screening, the air conditioning <br />units, etc. <br /> <br />Councilman Fauson <br />Drainage <br /> <br />Expressed concern with the drainage on the <br />southern portion of the site. <br />Acting City Engineer Huson advised that they <br />are proposing an open swale and the major <br />drainage study shows a pipe under the rail- <br />road tracks; and they propose to carry drain- <br />age from that portion along the southern <br />boundary of their subdivision. Then install <br />new culvert underneath Colorado Highway 42 <br />and have been working with the State Highway <br />Dept. to get that installed. The side drain- <br />age is taken care of on site detention and <br />will eventually ends into that same swale. <br />
The URL can be used to link to this page
Your browser does not support the video tag.