Laserfiche WebLink
• April 23, 2021 ERO Redtail Ridge — 2021 Wildlife Use Assessment (Attachment <br />No. 4) <br />• September 7, 2022 ERO Tree Inventory (Attachment No. 5) <br />• April 27, 2021 High Plains Environmental Center Redtail Ridge Management <br />Recommendations DRAFT (Attachment No. 6) <br />• March 23, 2020 ERO Initial Raptor Nest Survey (Attachment No. 7) <br />• January 19, 2021 ERO Migratory Bird Nest Surveys (Attachment No. 8) <br />• January 19, 2021 ERO Baseline Burrowing Owl Survey (Attachment No. 9) <br />• July 16, 2021 Burrowing Owl Survey (Attachment No. 10) <br />• January 19, 2021 ERO Prairie Dog Management Plan (Attachment No. 11) <br />In addition, there is a section of the Goodhue Ditch that is categorized as a federal <br />jurisdictional wetland, shown in the image below. The plans include realignment and <br />piping of the ditch in this vicinity. This section of the Ditch is exempt from Army Corps <br />of Engineer 404 Permit requirements. Attachments 12 and 13 include a wetlands <br />delineation memo from ERO Resources Corp and the Army Corps of Engineers <br />determination letter respectively. <br />Redtail Ridge Prelim/Final Plat Page 3 of 14 <br />PC — September 22, 2022 <br />