My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 2022-1845
PORTAL
>
CITY COUNCIL RECORDS
>
ORDINANCES (45.120)
>
2022 Ordinances
>
Ordinance 2022-1845
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:18:34 PM
Creation date
1/13/2023 12:31:35 PM
Metadata
Fields
Template:
City Council Records
Also Known As (aka)
IECC 2021__Municipal Code Chapter 15.18.030__Amendments and Deletions to Include Requirements for Commerical Energy Use Intensity Performance Targets and Restrictions
Meeting Date
12/20/2022
Doc Type
Ordinance
Signed Date
12/20/2022
Ord/Res - Year
2022
Ord/Res - Number
1845
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PT104 Renewable Energy. On -site renewable energy generated bra system <br />installed as part of this project that is used by the building shall be subtracted <br />from the proposed designgy consumption prior to calculating the proposed <br />building_ performance. <br />PT105 Performance documentation. Documentation to verify compliance with <br />this section shall be provided to the code official. <br />PT105.1 Proiected compliance report. Permit submittals shall include a <br />report documenting the proposed design is projected to meet the EUI target. <br />The compliance report shall include the following specific information <br />beyond the information required in ASHRAE 90.1 Appendix G: <br />1. Address of the building. <br />2. An inspection checklist documenting the building component characteristics <br />of the proposed design. <br />3. Name of individual completing the he report. <br />4. Name and version of compliance software tool. <br />5. Documentation of the reduction in energy use associated with on -site energy. <br />PT105.2 Construction plan requirements. Construction plans shall depict <br />all component characteristics of the proposed design utilized for the EUI in <br />accordance with ASHRAE 90.1 Appendix G. <br />PT105.3 Measured performance report. Projects shall demonstrate <br />compliance with this code by documenting that the building has achieved the <br />EUI performance calculated based on 12 months of metered energy use after <br />occupancy. <br />PT105.3.1 Demonstration of operating energy use. Metered energy data <br />demonstrating compliance with the EUI target shall be reported to the <br />building official using Energy Star Portfolio Manager and adjusted for the <br />percentage of floor area occupied. While at least 75 percent occupied, the <br />building shall operate at or below its assigned energy use target <br />established in Section PT103 for any recording_ period of 12 consecutive <br />months that is completed within three years of the date of the Certificate <br />of Occupancy. The owner shall notify the building official when this 12- <br />month period has been successfully coMpleted. <br />PT106 Energy metering and monitoring. All projects must install submetering <br />or monitoring capabilities to support building energy performance analysis. The <br />project must include capabilities to store and access a 24-month continuous data <br />set on an ongoing basis. <br />
The URL can be used to link to this page
Your browser does not support the video tag.