Laserfiche WebLink
PT104 Renewable Energy. On -site renewable energy generated bra system <br />installed as part of this project that is used by the building shall be subtracted <br />from the proposed designgy consumption prior to calculating the proposed <br />building_ performance. <br />PT105 Performance documentation. Documentation to verify compliance with <br />this section shall be provided to the code official. <br />PT105.1 Proiected compliance report. Permit submittals shall include a <br />report documenting the proposed design is projected to meet the EUI target. <br />The compliance report shall include the following specific information <br />beyond the information required in ASHRAE 90.1 Appendix G: <br />1. Address of the building. <br />2. An inspection checklist documenting the building component characteristics <br />of the proposed design. <br />3. Name of individual completing the he report. <br />4. Name and version of compliance software tool. <br />5. Documentation of the reduction in energy use associated with on -site energy. <br />PT105.2 Construction plan requirements. Construction plans shall depict <br />all component characteristics of the proposed design utilized for the EUI in <br />accordance with ASHRAE 90.1 Appendix G. <br />PT105.3 Measured performance report. Projects shall demonstrate <br />compliance with this code by documenting that the building has achieved the <br />EUI performance calculated based on 12 months of metered energy use after <br />occupancy. <br />PT105.3.1 Demonstration of operating energy use. Metered energy data <br />demonstrating compliance with the EUI target shall be reported to the <br />building official using Energy Star Portfolio Manager and adjusted for the <br />percentage of floor area occupied. While at least 75 percent occupied, the <br />building shall operate at or below its assigned energy use target <br />established in Section PT103 for any recording_ period of 12 consecutive <br />months that is completed within three years of the date of the Certificate <br />of Occupancy. The owner shall notify the building official when this 12- <br />month period has been successfully coMpleted. <br />PT106 Energy metering and monitoring. All projects must install submetering <br />or monitoring capabilities to support building energy performance analysis. The <br />project must include capabilities to store and access a 24-month continuous data <br />set on an ongoing basis. <br />