My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
City Council Agenda and Packet 2023 02 28 SP
PORTAL
>
CITY COUNCIL RECORDS
>
AGENDAS & PACKETS (45.010)
>
2023 City Council Agendas and Packets
>
City Council Agenda and Packet 2023 02 28 SP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2024 3:14:14 PM
Creation date
3/8/2023 10:13:53 AM
Metadata
Fields
Template:
City Council Records
Meeting Date
2/28/2023
Doc Type
City Council Packet
Original Hardcopy Storage
9C6
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Poor (PCI = 25 to 40) — last Opportunity for Surface Base Rehabilitation <br />East Street from Pine to End of Pavement (GISID 2064, PCI = 27) — Rated as Poor, this segment still has <br />some remaining life before it becomes a critical reconstruction need. As evident in the imagery, a fair <br />amount of the segment is severely cracked, and the severity of the cracking strongly contributes to the <br />lower PCI score of this segment. If left untreated, within a short period of time, a partial to full <br />reconstruction would be required. <br />On heavily trafficked roadways, Poor streets often require partial to full reconstruction. On local <br />roadways, they require removal of the pavement surface through grinding or excavation, base repairs, <br />restoration of the curb line and drainage, and then placement of a new surface. <br />IMS Pavement Management Report Louisville, CO 2022 Page 1 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.