Laserfiche WebLink
Poor (PCI = 25 to 40) — last Opportunity for Surface Base Rehabilitation <br />East Street from Pine to End of Pavement (GISID 2064, PCI = 27) — Rated as Poor, this segment still has <br />some remaining life before it becomes a critical reconstruction need. As evident in the imagery, a fair <br />amount of the segment is severely cracked, and the severity of the cracking strongly contributes to the <br />lower PCI score of this segment. If left untreated, within a short period of time, a partial to full <br />reconstruction would be required. <br />On heavily trafficked roadways, Poor streets often require partial to full reconstruction. On local <br />roadways, they require removal of the pavement surface through grinding or excavation, base repairs, <br />restoration of the curb line and drainage, and then placement of a new surface. <br />IMS Pavement Management Report Louisville, CO 2022 Page 1 18 <br />