Laserfiche WebLink
OWNERSHIP SIGNATURE BLOCK: <br />THE UNDERSIGNED AS THE OWNER OF THE LANDS DESCRIBED HEREIN, HEREBY AGREES ON BEHALF OF <br />ITSELF, AND ITS HEIRS, SUCCESSORS AND ASSIGNS TO DEVELOP AND MAINTAIN THE PROPERTY DESCRIBED <br />HEREON IN ACCORDANCE AND COMPLIANCE WITH THIS APPROVED PLAN AND THE LOUISVILLE MUNICIPAL <br />CODE. <br />JEFF <br />�r <br />ANAGER, ALLIANCE INVESTMENTS, LLC, AS MANAGER OF ARTHUR AVE LLC <br />{.' <br />SIGNED BEFORE ME ON a2.''d DAY OF rnax-c'n , 20 ZS <br />BY:`-F W ei'- <br />i cn�u7P re") <br />NOTARYSIGNATURE <br />CLeJ <br />TITLE OF OFFICE <br />MY COMMISSION EXPIRES 3 Li L.) al <br />SEAL: <br />GENEVIEVE M KLINE <br />NOTARY PUBLIC <br />STATE OF COLORADO <br />NOTARY iD 20074026395 <br />MY COMIAIS9ION EXPIRES JULY 09, 2023 <br />CITY COUNCIL CERTIFICATE: <br />APPROVED THIS 3r421DAY OF -SOW , 20 23 <br />BY THE CITY i NCIL OF THE CITY OF LOUISVILLE, COLORADO. <br />BY f42f <br />illfe kri <br />MAYOR <br />CITY <br />RESOLUTION NO. I , SERIES 10 LI <br />PLANNING COMMISSION CERTIFICATE: Dec...4)pr, <br />APPROVEDTHIS JLDAY OF 20 Z 2- <br />BY THE PLANNING COMMISSION OF THE CITY OF LOUISVILLE, COLORADO. <br />RESOLUTION NO. lc , SERIES Lb 2 2 <br />VICINITY MAP (U.S. <br />THE BUSINESS CENTER AT C.T.0 REPLAT 1, PUD 1ST AMENDMENT, <br />LOT 1A, BLOCK 1, BUSINESS CENTER AT CTC REPLAT I <br />NORTHWEST I OF SECTION 16, TOWNSHIP 1 SOUTH, RANGE 69 WEST, 6TH PRINCIPAL MERIDIAN, <br />CITY OF LOUISVILLE, COUNTY OF BOULDER, STATE OF COLORADO <br />PROJECT DESCRIPTION: <br />OFFICE CONDOMINIUMS, FLEX INDUSTRIAL UNITS, COMMON AMENITY SPACES. <br />THE BUILDING DESIGN HAS BEEN MODIFIED FROM AN ALL -OFFICE DESIGN TO A DESIGN THAT ACCOMMODATES A MIX OF <br />LIGHT INDUSTRIAL AND OFFICE TYPE BUSINESSES. CHANGES TO THE ORIGINAL PUD APPLICATION INCLUDE: TOTAL <br />BUILDING AREA CHANGES, MODIFICATION OF THE BUILDING FOOTPRINT, MODIFICATIONS TO THE FLOOR PLANS, CHANGE IN <br />BUILDING HEIGHT, TOTAL PARKING COUNT CHANGES, PARKING TYPE CHANGES, ELIMINATION OF THE UNDERGROUND <br />PARKING, THE ADDITION OF A COURTYARD LOCATED ADJACENT TO THE COMMON SPECIAL EVENT SPACE ('THE GROTTO'). <br />THE CIVIL ENGINEERING AND LANDSCAPE ARCHITECTURE DRAWINGS HAVE BEEN MODIFIED TO ACCOMMODATE THE NEW <br />BUILDING DESIGN DIRECTION. <br />WAIVER REQUESTS: <br />1. CDDSG 2.1.1.J ALLOW VEHICLE ACCESS TO LEAD DIRECTLY INTO 'HEAD IN' PARKING AT WEST ENTRANCE. <br />2. CDDSG 5.2.B. ELIMINATE THE REQUIRED 30' WIDE BUFFER PLANTING STRIP CONTAINING A MINIMUM OF 1 TREE FOR <br />EVERY 20 LINEAL FEET OF PROPERTY LINE AND A SCREEN HEDGE INCORPORATING BOTH DECIDUOUS AND EVERGREEN <br />SHRUBS A MINIMUM OF 3' IN HEIGHT ALONG A MINIMUM OF 50% OF THE PERIMETER AREA. <br />WAIVERS APPROVED BY RESOLUTION NO. 17 2019 ON 11.14.2019: <br />1. CDDSG STANDARDS SECTION 1.2 C FOR 8'-10" INTERNAL ! COMMON PROPERTY BOUNDARY PARKING SETBACK AT THE NORTH BOUNDARY. <br />2. CDDSG STANDARDS SECTION 4.2 FOR 401-6' MAXIMUM AVERAGE BUILDING HEIGHT. <br />3. CDDSG STANDARDS SECTION 4.5.1 H FOR PAINTED METAL & PLAIN UNFINISHED CONCRETE AS ACCEPTABLE MATERIALS. <br />4. CDDSG STANDARDS SECTION 5.2 A FOR NO TREES IN THE NORTHERN COLORADO WATER CONSERVANCY DISTRICT EASEMENT AREA. <br />PROJECT HISTORY LIST <br />PUD APPLICATION <br />PUD APPLICATION REVISION 1 <br />FINAL PUD SUBMITTAL <br />PUD AMENDMENT APPLICATION <br />PUD AMENDMENT APPLICATION REVISION 1 <br />PUD AMENDMENT APPLICATION REVISION 2 <br />GENERAL NOTES: <br />6.6.2019 <br />8.30.2019 <br />9.27.2019 <br />4.21.2022 <br />7.8.2022 <br />10.7.2022 <br />1. THE CITY OF LOUISVILLE IS NOT RESPONSIBLE FOR DAMAGE TO OR REPAIR OF MONUMENT SIGNS, <br />PAVEMENT SURFACES, OR LANDSCAPING CAUSED DURING REPAIR OR MAINTENANCE OF UTILITIES <br />LOCATED WITHIN PUBLIC UTILITY EASEMENTS. <br />2. PROPERTY OWNER SHALL REPLACE EXISTING CURB AND GUTTER THAT HAS <br />SETTLED OR IS OTHERWISE DAMAGED ADJACENT THE SITE. <br />3. PROPERTY OWNER SHALL MAINTAIN, REPAIR, AND REPLACE THE ADA RAMPS AT <br />THE S. ARTHUR AVE. DRIVE LOCATIONS, AS DIRECTED BY THE CITY. <br />04003829 04/13/2023 12:15 PM <br />RF: $183.00 DF: $0.00 Page: 1 of 18 <br />Electronically recorded in Boulder County Colorado. Recorded as received. <br />PROJECT DATA <br />OWNER INFO: ARTHUR AVE LLC <br />MANAGER, ALLIANCE <br />INVESTMENTS, LLC <br />OWNER CONTACT: JEFF WELBER, MANAGER <br />512.809.5089 <br />JWELBER@ALLIANCEINV.COM <br />ZONING: <br />APPROVED <br />CODES: <br />PLANNED COMMUNITY ZONE <br />DISTRICT <br />INDUSTRIAL (PCZD-I) <br />WITH AMENDMENTS <br />LOUISVILLE MUNICIPAL CODE <br />COMMERCIAL DEVELOPMENT <br />DESIGN STANDARDS AND <br />GUIDELINES <br />PROJECT TEAM <br />ARCHITECT: <br />LANDSCAPE <br />ARCHITECT: <br />DAJ DESIGN <br />922A MAIN STREET <br />LOUISVILLE, CO 80027 <br />303.527.1100 <br />OUTSIDE LA <br />BOULDER, CO <br />303.517.9256 <br />CIVIL ENGINEER: CREATIVE CIVIL SOLUTION <br />923 MAIN STREET #2 <br />LONGMONT, CO 80501 <br />303.684.8484 <br />MEP ENGINEER: .ICAO <br />4100 WADSWORTH BLVD. <br />WHEATRIDGE, CO 80033 <br />303.985.3260 <br />SHEET INDEX <br />1 OF <br />2 OF <br />3 OF <br />4 OF <br />5 OF <br />6 OF <br />7 OF <br />8 OF <br />9 OF <br />10 OF <br />11 OF <br />12 OF <br />13 OF <br />14 OF <br />15 OF <br />16 OF <br />17 OF <br />18 OF <br />18 COVER SHEET <br />18 PUD DEVELOPMENT PLAN <br />18 MASTER GRADING PLAN <br />18 MASTER UTILITY PLAN <br />18 ELEVATIONS <br />18 ELEVATIONS <br />18 ELEVATIONS <br />18 ELEVATIONS <br />18 ELEVATIONS <br />18 LANDSCAPE PLAN <br />18 LANDSCAPE PLAN <br />18 LANDSCAPE PLAN <br />18 LANDSCAPE NOTES & DETAILS <br />18 LANDSCAPE SITE FURNISHINGS <br />18 HYDROZONE PLAN <br />18 PHOTOMETRIC PLAN <br />18 LIGHTING SPECIFICATIONS <br />18 LIGHTING SPECIFICATIONS <br />USE <br />FLEX INDUSTRIAL <br />OFFICE <br />NET AREA <br />27,544 SF <br />43,066 SF <br />CITY STANDARD <br />1 PER 10 AUTO PARKING SPACES <br />SHEET NAME: <br />COVER SHEET <br />DAJDESIGN <br />922A MAIN STREET <br />LOUISVILLE. CO 80027 <br />P. 303.527.1100 <br />INFOQDAJDESIGN.COM <br />SITE DATA TABLE <br />TOTAL SITE AREA: <br />SITE COVERAGE <br />BUILDING: <br />PARK/DRIVE: <br />OPEN SPACE <br />HARDSCAPE: <br />LANDSCAPE: <br />TOTAL <br />BUILDING HEIGHT <br />HIGHEST GRADE ELEV.: <br />LOWEST GRADE ELEV.: <br />MAX. BUILDING HT.: <br />BUILDING AREAS <br />BASEMENT: <br />MAIN LEVEL: <br />UPPER LEVEL + <br />MEZZANINES <br />TOTAL GROSS AREA: <br />NET AREA: <br />BUILDING SETBACKS <br />NORTH: <br />NORTHWEST: <br />SOUTHWEST: <br />SOUTH: <br />EAST: <br />PARKING SETBACKS <br />NORTH: <br />NORTHWEST: <br />SOUTHWEST: <br />SOUTH: <br />EAST: <br />PARKING STANDARDS <br />STANDARD SPACES: <br />RIDE SHARE: <br />SUBTOTAL: <br />EV PARKING <br />READY (7%) <br />INSTALL (10%): <br />CAPABLE (15%): <br />ADA PARKING <br />STANDARD ADA. <br />VAN ADA <br />SUBTOTAL: <br />GARAGE PARKING <br />INDOOR: <br />TOTAL PARKING: <br />PARKING RATIO: <br />AUTOMOBILE PARKING SUMMARY <br />CITY STANDARD REQUIRED <br />4 PER 1000 SF 110 SPACES <br />4 PER 1000 SF 172 SPACES <br />TOTAL PARKING SPACES: 282 SPACES <br />BICYCLE PARKING SUMMARY <br />REQUIRED PROVIDED <br />REQUIRED <br />NA <br />175,705 SF <br />(70% MAX.) <br />75,302 SF <br />(30% MIN.) <br />25,098 SF <br />(33% MAX.) <br />22,591 SF <br />(30% MIN.) <br />251,007 SF <br />(100%) <br />MAXIMUM <br />NA <br />NA <br />35'-0" <br />MAXIMUM <br />NA <br />NA <br />NA <br />NA <br />NA <br />MAXIMUM <br />25'•0' <br />50'-0' <br />35'-0' <br />35'-0" <br />25'-0" <br />REQUIRED <br />8'-10" <br />25'-0" <br />15-0" <br />15-0" <br />101-0" <br />REQUIRED <br />183 <br />0 <br />183 <br />REQUIRED <br />20 <br />29 <br />43 <br />REQUIRED <br />5 <br />2 <br />7 <br />REQUIRED <br />0 <br />282 <br />3.4:1000 <br />PROPOSED <br />251,007 SF <br />131,741 SF <br />(52%) <br />52,735 SF <br />(40%) <br />79,006 SF <br />(60%) <br />119,226 SF <br />(48%) <br />24,613 SF <br />(21%) <br />94.653 SF <br />(79%) <br />251,007 SF <br />(100%) <br />PROPOSED <br />5,377.5' <br />5,367'.67' <br />PROPOSED <br />NA <br />40,259 SF <br />30,351 SF <br />84,164 SF <br />70,610 SF <br />PROPOSED <br />30'-6' <br />55'-3' <br />35'-0" <br />87'-9' <br />90'-1' <br />PROPOSED <br />32'-6' <br />240'-11' <br />62'-6" <br />28'-10" <br />12'-S" <br />PROPOSED <br />120 <br />4 <br />124 <br />PROPOSED <br />15 <br />21 <br />31 <br />PROPOSED <br />2 <br />4 <br />6 <br />PROPOSED <br />8 <br />205 <br />2.9:1000 <br />PROVIDED <br />69 SPACES <br />138 SPACES <br />205 SPACES <br />29 40. *20 BICYCLE PARKING SPACES PROPOSED INDOOR <br />SHEET 4 OF 18 <br />OCTOBER 24,2022 <br />