Laserfiche WebLink
<br />Improvc infrastructurc along Hwy. 42 Corridor <br /> <br />Step #1: <br /> <br />Work with the City and CDOT to determine scope. schedule and status of Hwy. 42 <br />widening project from South Boulder Road to Pine Street, to include signature clements <br />that showcase gateways to the City. Use this information to formulate the Scope of Work <br />for the selected consultant team. <br /> <br />Step #2: <br /> <br />Consultant requires civil engincering and real estate development expertise to identify, <br />quantify, cost and evaluate altcmative approaches on infrastructure issues impacting <br />existing businesscs and desired development along the corridor. Work should include: <br /> <br />. Use of existing infoI111ation Ii'om City, County, CDOT, Army Corps of Engineers <br />and other relevant sources <br /> <br />. Focus on: <br />o Flood Plain Mitigation <br />o Connectivity and access between the core area within the Hwy. 42 <br />corridor and thc South Boulder Road properties, along Hwy. 42 <br />o Water. Sewer. St0I111 Sewcr <br />o Beautification opportunities <br />o Gateway signage and cnhancement at the Pine Strcet cntrance at Hwy. 42 <br />o Multi-model acccss to include pedestrian, bike. bus and <br />access/connections <br />o Widening, acccss and signalization along Hwy. 42 <br />o Other infrastructure issues impeding development <br /> <br />. For each topic: <br />o Assess the current condition ofthc infrastructure. <br />o Assess the impact of the current condition on potential redevelopment of <br />the area. <br />o Provide altelllative designs. with associated costs, for inli'astructure <br />improvements that would enhance redevelopment of the area. <br />o Prioritizc and recommend infrastructure investments in tCllllS of <br />community benefit and funding viability. <br /> <br />Datc of Commcnccment: Second Quarter 2009 <br />Targcted Datc of Complction: Foul1h Quartcr 2009 <br />