Laserfiche WebLink
STEEL DOOR FRAME: <br />2"x2"xl/4" ANGLES WITH <br />2"xI/4" PLATE DIAGONAL <br />BRACES <br />I6'-0" <br />8'-0" <br />3'-4" 3'-4" <br />PRE —CAST GONG. WALL <br />PANEL — MATCH BUILDING— �_ <br />STEEL SWING BAR LATCH <br />2x4 STEEL TUBE (BOLT <br />TO 8" CONCRETE BLOCK) <br />—1/8"cPx3" STEEL SLEEVE <br />WELDED TO DOOR FRAME <br />5/8"c1) STEEL 'HINGE' PIN <br />WELDED TO CHANNEL <br />VERTICAL METAL ROOF <br />DECKING —PAINT TO <br />MATCH BUILDING <br />SLOPE CONCRETE FOR <br />DRAINAGE —TYPICAL <br />0 <br />r/ <br />`\ <br />/,/ <br />' <br />�� <br />i,ij <br />'/ <br />r� <br />\\ <br />- <br />' \ <br />O <br />\\ <br />, <br />/, <br />\\ <br />,/ <br />i, <br />% <br />J <br />\\ <br />1 <br />l' <br />% <br />7'-8 <br />8'-0" <br />FRONT ELEVATION <br />SCALE: 1/4" — 1'-0" <br />PRE —CAST <br />CONC. HALL <br />RECYCLE BINS <br />4" CONCRETE SLAB —\ <br />82" WIDE 15" DEEP <br />DUMPS E N.I.G.) <br />7'-8" WIDE GATE — <br />SEE ELEVATION <br />m <br />tst <br />0 <br />O <br />I/5" / FOOT <br />i <br />8'0" <br />/'/ <br />I6'—O" <br />3'-4" <br />3'-4" <br />FLAN <br />SCALE: 1/4" — I'-0" <br />TRASH ENCLOSURE <br />i3) DETAILS <br />SC. -ALE: <br />I'-4" <br />P. <br />1/4" = 1'-0" <br />2"cI) STEEL PIPE — SET <br />ENDS IN NON -SHRINK <br />GROUT (PAINT TO MATCH <br />WINDOW FRAMES) <br />4" CONCRETE <br />SLAB <br />PRE—GAST GONG. <br />WALL PANEL — <br />MATCH BUILDING <br />10 '-0" <br />• <br />• <br />O <br />BIKE RACK DETAIL / <br />PAINTED SITE GAST <br />CONCRETE PANEL <br />2" REVEAL <br />LETTERING BY <br />TENANT <br />COLOR 'B' <br />2" SILL <br />GRADE <br />GROUND SPOTLIGHT <br />AT SIGN <br />NOTE: MONUMENT SIGN TO <br />COMPLY WITH THE GDDSG <br />1/2" = 1'-0" <br />7'-0" <br />/ COLOR 'A' <br />XYZ CORPORATION <br />39 SOUTH 104TH STREET <br />COLORADO TECHNOLOGICAL CENTER <br />r = i <br />STONE VENE <br />SIGN DETAIL <br />SC- <br />ALE: <br />1/2" = 1'-0" <br />ER <br />N <br />CI <br />/ <br />/ <br />1 <br />1 <br />11 <br />1! <br />III <br />LI <br />SIDE ELEVATION <br />SCALE: 1/4" — 1'-0" <br />I II I I I <br />II I I <br />I I II <br />I I �I <br />III <br />III <br />III <br />III <br />III — <br />III <br />III <br />III <br />III <br />III <br />IIII <br />I II I <br />—2 <br />III. <br />I/2'I <br />1 \ <br />I \ <br />I 57'—a" \ \I <br />I E. CONCRETE' <br />RbP STRUCTURE <br />�'1Y`UrC-V.011410141141, <br />fir Wird Al I <br />II <br />rl <br />\ -(7 —\ <br />\ .-,`:_I"_____9_„_3______l GOA�/;c(f <br />ON EASCMEfit1DR�CINAGS CHANNEL <br />—ems--r— r j��?�aa <br />------- xo Iit <br />��1'��71 -- <br />�— w� `•-Grf: <br />N <br />3 ��3� 1 --�—� 3 3 3 3 3--3 <br />J <br />PROPOSED SETBACKS <br />BUILDING ONE: <br />FRONT (104TH <br />REAR: <br />SIDE (NORTH) : <br />SIDE (SOUTH - <br />STREET) : 164'± <br />240'± <br />50'± <br />DILLON RD): 116'± <br />BUILDING TWO: <br />FRONT (104TH <br />REAR: <br />SIDE (NORTH) : <br />SIDE (SOUTH - <br />STREET) : <br />DILLON RD): <br />PARKING: <br />51 g FRONT (GTG BOULEVARD) : <br />c40'± REAR: <br />411'± SIDE (NORTH): <br />116± SIDE (SOUTH - DILLON RD): <br />q2'± <br />II'± <br />41'± <br />82'± <br />// <br />POLE LIGHT — RE: E4' T. <br />/ <br />� a <br />DET6ITION POND <br />O <br />T-1—/—T—I—T—I——T—I—T-1 —r—T—I—T <br />I I/ I I I I I I I I I/t1 1 1 1 <br />/1 <br />/ <br />N 'NTH <br />0 0 -- o -----9 <br />3 3 <br />50' DRAINAGE AND UTILI <br />18 �' I 17 -rWL JLL IGHT j <br />1._• 1 7 "1' 1 REI: ELIECT. 1 <br />I I J I_ <br />LOADING / DE <br />PARKING (102 SPACES) <br />I 1 1 1 1 1 1 I <br />1 1 1 1 1 1 1 1 <br />• <br />3 <br />0 <br />• <br />2 o <br />C y <br />0. 2 <br />° <br />Suite 100 <br />7 <br />C <br />N a 4% <br />° > 0 <br />CD s- <br />a)( <br />o 0L 0 <br />aO <br />(12 <br />Q <br />v• W <br />co <br />O <br />co <br />co <br />co <br />O <br />4 <br />0) <br />O <br />co <br />X <br />to <br />e) <br />r) <br />0) <br />0 <br />(ram,) <br />a <br />I Ps <br />MD <br />Colorado Technological Center <br />N <br />0 <br />Colorado <br />1 <br />0) <br />3 <br />0 <br />739 South 104th Street <br />PROJ NO: 08-18 <br />DATE: OCTOBER 16, 2008 <br />REV: MAY 7, 2009 <br />AUG 10, 2009 <br />AUG 31, 2009 <br />waNwd Il1lrAndd earwand <br />CIOIM1dla P.C. M M . <br />dmil asaulwrllMMM1idiM <br />=7.7mot be sal or <br />mn*, vitae <br />aoMMta IVIPAidukt na id <br />DEVELOPMENT PLAN <br />