Laserfiche WebLink
<br />Exhibit A <br />BUILDING SAFETY VALUATION TABLE <br /> <br />Square Foot Construction Cost <br />Building Standards Magazine, August 2009 <br /> <br />Occupation Group 2009 18C 1A 18 2A 28 3A 38 4 5A 58 <br />A-1 Assembly, theaters, with staqe 202.05 195.53 190.98 182.97 172.26 167.18 177.12 157.17 151.38 <br />A-1 Assembly, theaters, without 182.99 176.47 171.91 163.91 153.24 148.16 158.07 138.15 132.36 <br />stage <br />A-2 Assembly, niqhtclubs 155.74 151.36 147.50 141.90 133.46 129.73 136.94 121.02 116.96 <br />A-2 Assembly, restaurants, bars, 154.74 150.36 145.50 140.90 131.46 128.73 135.94 119.02 115.96 <br />banquet halls <br />A-3 Assembly, churches 186.22 179.70 175.15 167.15 156.44 151.36 161 .30 141.35 135.56 <br />A-3 Assembly, general, community 157.46 150.93 145.39 138.38 126.08 122.58 132.53 111.57 106.79 <br />halls, libraries <br />A-4 Assembly, arenas 181.99 175.47 169.92 162.91 151.24 147.16 157.07 136.15 131.36 <br />B Business Includes TF 154.89 149.31 144.53 137.72 125.27 120.56 132.32 109.78 105.26 <br />B Business Core and Shell 123.91 119.45 115.63 110.18 100.22 96.45 105.86 87.83 84.21 <br />E Educational 171.53 165.59 160.55 153.20 141.88 134.72 147.92 123.99 119.32 <br />F-1 Factory and Industrial, moderate 94.86 90.51 85.32 82.51 73.88 70.62 79.19 60.84 57.54 <br />hazard <br />F-2 Factory and Industrial, low 93.86 89.51 85.32 81.51 73.88 69.62 78.19 60.84 56.54 <br />hazard <br />H-1 High Hazard, explosives 88.89 84.54 80.35 76.54 69.09 64.83 73.22 56.05 N.P. <br />H-2, 3, 4 High Hazard 88.89 84.54 80.35 76.54 69.09 64.83 73.22 56.05 51.75 <br />H-5 Hazardous Production Materials 154.89 149.31 144.53 137.72 125.27 120.56 132.32 109.78 105.26 <br />1-1 Institutional, Supervised 159.09 153.50 148.95 142.51 130.74 127.30 138.80 117 .44 112.84 <br />Environment <br />1-2 Institutional, Hospitals 260.68 255.10 250.32 243.51 230.40 N.P. 238.12 214.91 N.P. <br />1-2 Institutional, Nursina Home 182.27 176.70 171.91 165.10 153.06 N.P. 159.71 137.57 N.P. <br />1-3 Institutional, Restrained 178.01 172.44 167.66 160.85 149.66 143.95 155.45 134.16 127.64 <br />1-4 Institutional, Davcare Facilities 159.09 153.50 148.95 142.51 130.74 127.30 138.80 117.44 112.84 <br />M Mercantile 115.80 111.42 106.56 101.96 93.15 90.42 97.00 80.71 77.65 <br />R-1 Residential, Hotels 160.44 154.84 150.29 143.85 132.24 128.80 140.31 118.95 114.35 <br />R-2 Residential, Multiple Family 134.26 128.66 124.11 117.67 106.72 103.28 114.78 93.42 88.82 <br />I R-3 Residential, One and Two 126.16 122.65 119.64 116.48 112.21 109.30 114.55 105.15 98.95 <br />Family <br />R-4 Residential, Carel Assisted 159.09 153.50 148.95 142.51 130.74 127.30 138.80 117.44 112.84 <br />Living <br />S-1 Storage, Moderate Hazard 87.89 83.54 78.35 75.54 67.09 63.83 72.22 54.05 50.75 <br />S-2 Storage, Low Hazard 86.89 82.54 78.35 74.54 67.09 72.83 71.22 54.05 49.75 <br />U Utility, Miscellaneous 68.86 64.97 60.79 57.48 51.24 47.92 54.61 39.75 37.87 <br /> <br />N.P. = Not Permitted <br /> <br />Miscellaneous <br /> <br />Basement Unfinished $30.00 <br />Basement, Finished $25.00 <br />Garaae, Attached, Unfinished $37.87 <br />Garaqe, Finished $30.00 <br />Sunrooml Porch $20.00 <br />Decks $20.00 <br />Carports $15.00 <br /> <br />3 <br />