My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Planning Commission Agenda and Packet 2010 04 08
PORTAL
>
BOARDS COMMISSIONS COMMITTEES RECORDS (20.000)
>
PLANNING COMMISSION
>
2000-2019 Planning Commission
>
2010 Planning Commission Agendas Packets Minutes
>
Planning Commission Agenda and Packet 2010 04 08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2021 8:41:13 AM
Creation date
4/12/2010 1:25:32 PM
Metadata
Fields
Template:
City Council Records
Doc Type
Boards Commissions Committees Records
Supplemental fields
Test
PCPKT 2010 04 08
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Planning Commission <br />Meeting Minutes <br />February 11, 2010 <br />Page 6 of 15 <br />c. Quantify and resolve how to satisfy the demand on <br />water and wastewater utilities <br />d. Secure a North/South bikeway connection on the east <br />side of the campus <br />e. Finalize the Natural Resource Assessment <br />f. Finalize site plan and design review <br />g. Transportation Demand Management and Multi - <br />modal access plan <br />h. Remove any reference to Industrial land use in the <br />development summary table. <br />i. Finalize NW Parkway IGA Amendment to provide for <br />construction of Campus Drive. <br />2) Delete year references (i.e., "2008" and "1997") in Note 1 of <br />General Note on Sheet 1. <br />Commission Questions to Staff- <br />Loo requested clarification of information on page 9 of he staff report regarding <br />the Outlot. <br />McCartney discussed and illustrated location of t with a slide from the <br />power point presentation. He re d the Com sioners keep in mind the <br />Outlot area is still being discusse the Ci d ConocoPhillips. <br />Loo continued with questions regathe Fiscal Model and the Louisville Fire <br />Protection District site. <br />McCartney stated the City has reviewe <br />public input was also used. <br />McCartney reminded the Commissioners <br />need to come forward with a planned uni <br />e model prepared by ConocoPhillips, <br />Louisville Fire Protection District will <br />velopment for their site. <br />Lipton inquired about,the land located south of the subject property and in <br />Broomfield. Is it curr <br />space? <br />Balser stated the prope is part of the Northwest Parkway IGA and is also a <br />Conservation Easeme he IGA was completed when the NW Pkwy was built <br />and is betwee c unities of Louisville, Broomfield, Lafayette and Boulder <br />County. Its inten protect the property around the NW Pkwy. <br />Lipton continued wi h a discussion of open space. <br />Stevens stated the communities of Broomfield, Superior and Louisville held a <br />joint meeting on January 7 to discuss open space as it relates to the <br />ConocoPhillips property. He stated the meeting provided a good beginning and <br />the work is still in progress. <br />Lipton requested a clarification of the land dedication required for open space. <br />McCartney confirmed it to be 12% of 309 acres for a total of 37 acres. <br />pace and how do we as a City keep it as open <br />
The URL can be used to link to this page
Your browser does not support the video tag.